Laserfiche WebLink
below the downstream cutoff wall to provide protection against erosion from flood flows in <br />excess of 100 cfs that overtop the cutoff walls. Phase 2 will also include the continued use of an <br />irrigation system to sustain riparian vegetation surrounding Ralston Creek. <br />Phase 3: Characterization and Long -term Reclamation — This phase of the Project will <br />include further Site characterization, which will allow Cotter to develop and implement a long- <br />term, sustainable reclamation plan for the Site. The long -term sustainable reclamation plan will <br />include removal of all pipelines and any required mitigation. <br />Attachment <br />October 7, 2011 <br />Page 3 <br />