My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-07_GENERAL DOCUMENTS - M1977300
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2011-10-07_GENERAL DOCUMENTS - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:53 PM
Creation date
11/8/2011 12:47:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/7/2011
Doc Name
Paragraph 30 of Amendment 3 to Notice of Violation/Cease and Desist.
From
Cotter
To
CDPHE-WQCD
Permit Index Doc Type
General Correspondence
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cotter <br />VIA EMAIL AND U.S. MAIL <br />October 7, 2011 <br />Colorado Department of Public Health and Environment <br />40 Water Quality Control Division/WQCD -B2 -CAS <br />Compliance Assurance Section <br />Attention: Michael Hams <br />4300 Cherry Creek Drive South <br />Denver, CO 80246 -1530 <br />Re: Paragraph 30 of Amendment 3 to Notice of Violation/Cease and Desist <br />Order Number: 10- 100601 -1 (issued September 27, 2011) <br />Dear Mr. Harris: <br />In response to Paragraph 30 of Amendment 3 to the Notice of Violation/Cease and Desist Order, <br />Number I0- 100601 -1, the majority of studies and assessments required for regulatory permitting <br />of Phase 1 of the pipeline diversion project (upper cutoff wall and temporary 8 cfs pipeline) have <br />been completed and submitted to various agencies for review and approval. The geotechnical <br />studies for Phase 1 of the pipeline diversion project have been completed, and the engineering <br />design work is now 90% complete. <br />Please find enclosed the proposed overall plan for the design and installation/construction of the <br />temporary diversion structure, along with the current permitting and construction schedule for <br />implementation of Phase 1. The detailed engineering drawings for Phase 1 are too large to send <br />electronically, but will be provided in hard copy via U.S. mail along with this submittal. <br />Sincerely, <br />.S <br />John S. Hamrick <br />Vice President, Mill Operations <br />Enclosure <br />cc: Daniel J. Arnold, Esq. (Denver Water) <br />David Bird (DRMS) <br />Cotter Corporation Telephone (719) 275 -7413 <br />Canon City Mill, P.O. Box 1750, Canon City, CO 81215.1750 USA Fax (719) 275 -1669 <br />- t4173o6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.