Environmental Protection Plan, Schwartzwalder Mine 15 -11 <br />Table 15 - 1. Proposed Schedule for Bedrock Monitoring Well Drilling <br />TASK <br />TASK 1 - Permitting <br />Stake proposed locations in the field, calculate disturbance, <br />prepare and submit application for new disturbance <br />Approval <br />TASK 2 - Prepare RFP <br />DURATION DATE <br />(Days) COMPLETE <br />21 <br />30 <br />5/31/2011 <br />6/30/2011 <br />Design wells, write contractor specifications, assemble bid <br />list, send out for bids 7 7/7/2011 <br />TASK 3 - Bid Process & Contractor Selection <br />Meet with drilling contractors for pre -bid site inspection 14 7/21/2011 <br />Meet with excavation contractor(s) for dozer work 7/21/2011 <br />Receive & review bids, award contract 7 7/28/2011 <br />TASK 4 - Permitting DWR (Notice of Intent, Form GWS -51) 3 7/28/2011 <br />TASK 5 - Site preparation <br />Re -open roads with dozer, excavate drill pads 7 8/4/2011 <br />TASK 6 — Downgradient Well Installation <br />Mob to site & begin drilling 10 8/14/2011 <br />Drilling (2 holes on one pad) 4 8/18/2011 <br />Monitoring well completion 2 8/20/2011 <br />Well development 1 8/21/2011 <br />TASK 7 — Upgradient Well Installation <br />Mob to upgradient site 1 8/22/2011 <br />Drilling & logging 5 8/27/2011 <br />Monitoring well completion 3 8/30/2011 <br />Well development 2 9/1/2011 <br />4109C.110510 Whetstone Associates <br />