My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-31_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2011-08-31_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:48 PM
Creation date
11/8/2011 12:46:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
8/31/2011
Doc Name
Phase 1 Biological Assessment.
From
IRIS Mitigation and Design, Inc.
To
Cotter Corporation
Type & Sequence
TR18
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRIS <br />MITIGATION AND DESIGN, INC. <br />SCHWARTZWALDER MINE PHASE 1 - UPSTREAM CUTOFF WALL AND LOW FLOW BYPASS <br />PIPELINE - BIOLOGICAL ASSESSMENT <br />5. EFFECTS OF THE ACTION 28 <br />5.1 Upstream Cutoff Wall Construction and Impacts 28 <br />5.2 Temporary Impacts 28 <br />5.3 Permanent Impacts 29 <br />5.4 Bypass Diversion Pipeline, Staging and Access Area Impacts 30 <br />5.5 Summary of Impacts 31 <br />6. DETERMINATION OF EFFECT 34 <br />7. REFERENCES AND PERSONAL COMMUNICATION CITED 35 <br />TABLES <br />Table 1: Table of Critical Species <br />Table 2: Upland Seed Mix <br />Table 3: Transitional Area Seed Mix <br />Table 4: Wetland Area Seed Mix <br />Table 5: Temporary Seed Mix <br />Table 6: Upland Shrubs for Mitigation Plan <br />Table 7: Riparian Shrubs for Mitigation Plan <br />Table 8: Impact Analysis for Phase 1 — Proposed Cutoff Wall <br />Table 9: Impact Analysis for Phase 1 — Proposed Low Flow Bypass Pipeline and Remainder Impacts <br />Table 10: Impact Analysis for Phase 1 — Total Impacts <br />Table 11: Mitigation for Phase 1 — Total Impacts <br />FIGURES <br />Figure 1: Location Map <br />Figure 2: Site Map <br />Figure 3: Project Map <br />Figure 4: Upstream Cutoff Wall and Low Water Crossing Plan <br />Figure 5: Upstream Cutoff Wall Profile <br />Figure 6: Upstream Cutoff Wall Section <br />Figure 7: Project Impact Index Map <br />Page ii August 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.