Laserfiche WebLink
IRIS <br />MITIGATION AND DESIGN, INC. <br />SCHWARTZWALDER MINE PHASE 1 - UPSTREAM CUTOFF WALL AND LOW FLOW BYPASS <br />PIPELINE - BIOLOGICAL ASSESSMENT <br />5. EFFECTS OF THE ACTION 28 <br />5.1 Upstream Cutoff Wall Construction and Impacts 28 <br />5.2 Temporary Impacts 28 <br />5.3 Permanent Impacts 29 <br />5.4 Bypass Diversion Pipeline, Staging and Access Area Impacts 30 <br />5.5 Summary of Impacts 31 <br />6. DETERMINATION OF EFFECT 34 <br />7. REFERENCES AND PERSONAL COMMUNICATION CITED 35 <br />TABLES <br />Table 1: Table of Critical Species <br />Table 2: Upland Seed Mix <br />Table 3: Transitional Area Seed Mix <br />Table 4: Wetland Area Seed Mix <br />Table 5: Temporary Seed Mix <br />Table 6: Upland Shrubs for Mitigation Plan <br />Table 7: Riparian Shrubs for Mitigation Plan <br />Table 8: Impact Analysis for Phase 1 — Proposed Cutoff Wall <br />Table 9: Impact Analysis for Phase 1 — Proposed Low Flow Bypass Pipeline and Remainder Impacts <br />Table 10: Impact Analysis for Phase 1 — Total Impacts <br />Table 11: Mitigation for Phase 1 — Total Impacts <br />FIGURES <br />Figure 1: Location Map <br />Figure 2: Site Map <br />Figure 3: Project Map <br />Figure 4: Upstream Cutoff Wall and Low Water Crossing Plan <br />Figure 5: Upstream Cutoff Wall Profile <br />Figure 6: Upstream Cutoff Wall Section <br />Figure 7: Project Impact Index Map <br />Page ii August 2011 <br />