My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-31_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2011-08-31_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:48 PM
Creation date
11/8/2011 12:46:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
8/31/2011
Doc Name
Phase 1 Biological Assessment.
From
IRIS Mitigation and Design, Inc.
To
Cotter Corporation
Type & Sequence
TR18
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Impact Type <br />Riparian Habitat <br />Upland Habitat <br />Upland Not <br />Habitat <br />Permanent <br />Impact <br />Previously <br />Disturbed <br />0.14 acre <br />0.08 acre <br />Previously <br />Undisturbed <br />0 <br />0 <br />0 <br />Temporary <br />Impact <br />Previously <br />Disturbed <br />0.12 acre <br />0.56 acre <br />0.12 acre <br />Previously <br />Undisturbed <br />0.1 acre <br />0.09 acre <br />0 <br />Total Cutoff <br />Wall Impacts <br />0.36 acre <br />0.73 acre <br />0.12 acre <br />Impact Type <br />Riparian Habitat <br />Upland Habitat <br />Upland Not <br />Habitat <br />Permanent <br />Impact <br />Previously <br />Disturbed <br />0 <br />0 <br />Previously <br />Undisturbed <br />0 <br />0 <br />0 <br />Temporary <br />Impact <br />Previously <br />Disturbed <br />0.02 acre <br />0.6 acre <br />3.55 acres <br />Previously <br />Undisturbed <br />0.04 acre <br />0.06 acre <br />0 <br />Total Remaining <br />Project Impacts <br />0.06 acre <br />0.66 acre <br />3.55 acres <br />IRIS <br />MITIGATION AND DESIGN, INC. <br />SCHWARTZWALDER MINE PHASE 1 - UPSTREAM CUTOFF WALL AND LOW FLOW BYPASS <br />PIPELINE - BIOLOGICAL ASSESSMENT <br />Table 8 <br />Impact Analysis for Phase 1 - Proposed Cutoff Wall <br />Table 9 <br />Impact Analysis for Phase 1 - Proposed Low Flow Bypass Pipeline, Construction and <br />Materials Access and Staging <br />Page 17 <br />August 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.