My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-25_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2011-10-25_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:20 PM
Creation date
11/8/2011 12:46:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
10/25/2011
Doc Name
Review
From
IRIS Mitigation and Design, Inc.
To
U.S. Fish and Wildlife Service
Type & Sequence
TR18
Email Name
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Habitat <br />Type <br />Impact <br />hype <br />Impact <br />Amount <br />Mitigation <br />Ratio <br />Mitigation <br />Needed <br />Proposed Mitigation <br />Riparian <br />Habitat <br />Temporary <br />Impact <br />0.36 acre <br />1.5:1 <br />0.54 acre <br />• 0.09 acre to be seeded/mulched and <br />planted with approximately 1,000 willow <br />stakes during Phase 1 and planted/mulched <br />with 40 riparian trees during Phase 2 <br />(Mitigation Area 5 on Table 4). <br />• 0.45 acre to be restored in place at end of <br />Phase 3 along Ralston Creek (seeding, <br />planting trees, and staking willows). <br />Permanent <br />Impact <br />0.1 acre <br />2:1 <br />0.2 acre <br />• 0. 07 acre to be mitigated onsite during <br />Phase 1 (Mitigation Areas 2 -4 on Table 4). <br />• 0.13 acre to be mitigated at end of Phase 3 <br />along Ralston Creek. <br />Upland <br />Habitat <br />Temporary <br />Impact <br />1.3 acres <br />1.5:1 <br />1.95 acres <br />• 1.3 acres to be restored in place during <br />Phase 1 (seeding/mulching and planting of <br />Mitigation Area 6 on Table 4). <br />• 0.65 acre to be restored at end of Phase 3 <br />(upland seeding/mulching only). <br />Permanent <br />Impact <br />P <br />0 acre <br />2:1 <br />0 acre <br />• 0.09 acre to be mitigated onsite during <br />Phase 1 (Mitigation Area 1 on Table 4). <br />Riparian <br />Trees <br />Permanent <br />Impact <br />170 trees <br />Varies <br />Depending <br />on dbh* <br />252 <br />Riparian <br />Trees <br />• 40 riparian trees to be planted /mulched <br />during Phase 2 (Mitigation Area 5 on <br />Table 4). <br />• 212 riparian trees to be planted/mulched <br />during Phase 3 along Ralston Creek. <br />Upland <br />Trees <br />Permanent <br />Impact <br />10 trees <br />Varies <br />depending <br />on dbh* <br />18 Upland <br />Trees <br />• 18 upland trees to be planted /mulched <br />during Phase 1 (Mitigation Area 6 on <br />Table 4). <br />IRIS <br />MITIGATION AND DESIGN, INC. <br />Environmental Consulting <br />*dbh = diameter breast height <br />Schwartzwalder Mine Phase 1 <br />Response to USFWS Comments <br />Table 1 <br />Mitigation for Phase 1— Total Impacts <br />Page 4 <br />IRIS MITIGATION AND DESIGN, INC. <br />3450 W. 32nd Avenue, 2nd Floor <br />Denver, Colorado 80211 <br />Phone: 720 - 272 -1985 <br />bleisure@irismitigation.com <br />October 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.