Laserfiche WebLink
October 19, 2011 C-1994-082/Yoast Mine SLB <br /> in the toe of this slide will not allow all water to drain away from the slide (the toe bulge raises the grade),but the <br /> toe area was fairly dry. If the slide area becomes saturated and unstable again it may be necessary to construct a <br /> horizontal or French drain system. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> ,t J <br /> !�5�i.. . _ .ice���_ �4c" �• :��.' �, � <br /> Surge ponds in YPM13 drainage. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 3 <br />