My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-04_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-11-04_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:48 PM
Creation date
11/7/2011 11:08:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/4/2011
Doc Name
TR Conditional Approval
From
DRMS
To
CC&V
Type & Sequence
TR62
Email Name
TC1
TAK
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />November 4, 2011 <br />Mr. Timm Comer <br />Cripple Creek & Victor Gold Mining Company <br />100 N. Third Street <br />P.O. Box 191 <br />Victor, CO 80860 <br />Re: Cresson Project; DRMS File No. M- 1980 -244; Technical Revision Conditional <br />Approval, Revision No. TR -62 <br />Dear Mr. Comer, <br />On November 4, 2011, the Division of Reclamation, Mining and Safety (Division) approved <br />with conditions, the Technical Revision application submitted to the Division on October 6,2011, <br />addressing the following: <br />Sincerely <br />LOB Liner System Enhancement and VLF Ph 4c Berm Raise. <br />Conditions: The proposed VLF Ph 4c Berm Raise design allows the use of smooth or single - <br />sided textured 60 mil LLDPE. DRMS is not aware of any spec on file for 60 mil LLDPE. If 60 <br />mil LLDPE is used in construction, the Operator must provide an engineer approved <br />specification. <br />The terms of Technical Revision No. 62 approved by the Division are hereby incorporated into <br />Permit No. M- 1980 -244. All other conditions and requirements of Permit No. M- 1980 -244 <br />remain in full force and effect. Post construction submittal of an engineer's certification and as- <br />built report is required. Please submit the required reports for each of the two projects within 60 <br />days of their respective construction completion dates. <br />If you have any questions, please call me at 303 - 866 -3567 x8169. <br />Tiniotliy A. Cazier, P.E. <br />Environmental Protection Specialist <br />cc: Tony Waldron, DRMS <br />Tom Kaldenbach, DRMS <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pitleda <br />Director <br />Office of Office of <br />Mined Land Reclamation <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.