My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-04_REVISION - M2009018
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009018
>
2011-11-04_REVISION - M2009018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:24 PM
Creation date
11/7/2011 11:08:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009018
IBM Index Class Name
Revision
Doc Date
11/4/2011
Doc Name
Reply to Adequacy Letter of 19 October 2011.
From
Varra Companies, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sand Land Inc. <br />8120 Gage Street <br />(Frederick, CO 80516 <br />Dear Mr. Varra: <br />g. <br />A Subsidiary of <br />Anadarip2 <br />Petroleum Corporation <br />RE: Conveyor Construction 3N67wsec28 SW /4 <br />Kerr -McGee Oil & Gas Onshore LP <br />109918' Street <br />Denver, CO 80202 <br />Kerr -McGee Oil & Gas Onshore LP ( "KMG ") hereby approves the initial design of <br />the Sand Land Inc. ( "Sand Land ") conveyor to be constructed along Weld County Road 17 <br />between Weld County Road 28 and Highway 66 (the "Conveyor"), with the following <br />conditions: <br />a. The height of the Conveyor must be a minimum of 13'6" and posted such that KMG <br />tanker truck movement shall not be hindered by it; <br />b. The Conveyor must not go over the production facility at any point; <br />c. The overhead power lines associated with the Conveyor must be buried at least 36 <br />inches below the surface when located within 150' feet of KMG's production facility; <br />d. KMG must have 24 -hour access to its production facilities during and after the <br />construction process; <br />c. Sand Land must continue to consult with KMG on a new road access agreement; <br />f If Sand Land alters the initial Conveyor design in any way, Sand Land shall provide <br />KMG the opportunity to review and comment on any such alterations, and provide <br />possible further conditions. <br />Sand Land must place grounds throughout the Conveyor to assist in preventing static <br />electricity. <br />If, at any point during construction of the Conveyor, KMG determines that Sand Land <br />is not in compliance with any one or more of the above listed conditions, or any subsequently <br />added conditions based on alterations to the initial design. KMG shall notify Sand Land of <br />such non - compliance and Sand Land hereby agrees that it shall immediately cease <br />construction operations until such time as KMG deems compliance has been re- established. <br />By signing below, you hereby accept the terms and conditions contained herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.