Laserfiche WebLink
Annual Renort <br />Permit # - Min <br />date of the permit, an operator shall <br />subm it the annual fee, an annual report and a nd d map <br />p showing the extent of cu ent disturbances to a f aff <br />new <br />required e uired monitoring information, reclamation accomplished Y date and during the prece preceding year, year, for the <br />disturbance that is anticipated to occur during the upcoming any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceas <br />year, if any. Nance <br />ed in this report will be reviewed by the Division upon site receipt and prior <br />t h with the compliance Information contained you learn that your <br />inspection of the site." If, while completing this report, y ossible enforcement action.__ <br />and the act, it is advisable that the issues be rectified promptly to avoid p <br />NO <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) <br />r clearly marked in <br />2. Is the affected area boundary Y accordance with Rule 3.1.12(2) NO <br />fete � YES (1V� <br />3. If the mine site in final reclamation (all material extraction and stockpile removal is complete) <br />If "YES," please note time limits related to completion of <br />What was the date of last excavation, processing or hauling activity at the mine? <br />4. MOR <br />5. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />ctLre <br />+ incomplete and or unreleased reclamation) 6 - -- <br />7. Number of acres currently affected (mining <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year: <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />0 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />mulched w/ <br />a s proved mulch: <br />YES NO <br />YES NO <br />Total acres <br />fertilized w/ <br />a.vd fertilizer: <br />Fertilizer <br />application <br />method: <br />Mulch application <br />rate (tons): <br />