Laserfiche WebLink
12 -2 <br />3 <br />1999 Resource Recovery and Protection Plan <br />13 -1 <br />3 <br />Roadway Drainage Cross - Drainage Culvert Calculations, and Dip Sections -Coal <br />Creek <br />13 -2 <br />3 <br />Sediment Control Calculations <br />13 -3 <br />3 <br />Alternate Drainage <br />13 -4 <br />4 <br />Geotechnical Investigations: Cameo & Roadside Mines Refuse Pile <br />13 -5 <br />4 <br />Coal Waste Stability Study Cameo Refuse Piles 2 & 3 and Rocky Mountain <br />Geotechnical Figures 4 & 5 <br />13 -6 <br />4 <br />Geotechnical Investigation: Pond 12 <br />13 -7 <br />4 <br />Public Service of Colorado - Drainage South of Haul Road 5 <br />14 -1 <br />5 <br />BLM- Proposal for Revegetation Research Project <br />14 -2 <br />5 <br />Reclamation Plan Cost Estimate <br />14 -3 <br />5 <br />Reclamation Costs, Cameo Refuse Disposal Areas Nos. 2 and 3, and other <br />Areas <br />14 -4 <br />5 <br />Other Reclamation Cost Estimates <br />14 -5 <br />5 <br />Affected Land Owners Reclamation Approval <br />14 -6 <br />5 <br />Final Reclamation Drainage Design <br />14 -7 <br />5 <br />Revegetation Evaluation - Diversity <br />14 -8 <br />5 <br />Slope Stability Analysis - Roadside South Portal <br />14 -9 <br />5 <br />Approximate Original Contour Variance <br />14 -10 <br />5 <br />Steep Rock Slope Retention <br />14 -11 <br />5 <br />Re- Evaluation of Revegetation Success Standards — 2010 <br />14 -12 <br />5 <br />Soils Loss Comparison — South Portal & North Decline <br />15 -1 <br />5 <br />Mesa County Dept of Planning & Economic Development <br />South Portal Minor Site Plan <br />15 -2 <br />5 <br />Alternative Land Use, Halliburton Documents & Approvals, UTL <br />16 -1 <br />5 <br />Air Pollution Permits <br />17 -1 <br />5 <br />Material Safety Data Sheets <br />17 -2 <br />5 <br />Salinity Report <br />18 -1 <br />5 <br />BLM Consent for Monitoring on Jerry Creek and Coal Canyon <br />20 -1 <br />6 <br />Protective Pillar Design for Ute Water Property <br />20 -2 <br />6 <br />Angle of Draw Observations <br />20 -3 <br />6 <br />Pillar Design Analysis <br />20 -4 <br />6 <br />Subsidence Prediction <br />viii (Rev. 03/11) <br />