My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-30_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-09-30_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:34 PM
Creation date
11/4/2011 2:47:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
9/30/2011
Doc Name
Refuse Pile Expansion East
Section_Exhibit Name
Exhibit 82 Refuse Pile Expansion East
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
resourceful. naturally. BARR <br />• engineering and environmental consultants <br />Exhibit No. 82, TR 127 <br />Refuse Pile Expansion East <br />Mountain Coal Company, LLC <br />West Elk Mine <br />Addendum No. 1 <br />October 3, 2011 <br />The following text and permit drawing modify the July 2011, TR 127 version of the Refuse Pile <br />Expansion (RPE) East permit Exhibit No. 82. <br />• 1. Delete Section 4.1 in its entirety and replace with the following text: <br />4.1 Stripping <br />Vegetation will be removed and vegetative soil will be stripped from the refuse pile footprint <br />prior to preparing the drainage and site for placement of coal refuse materials. Vegetation that <br />can be chipped in place will be mixed with the vegetative soil to enhance the organic content. <br />Vegetative soil will be placed in designated stockpiles until needed for contemporaneous <br />reclamation as the face of the refuse pile reaches design grade (Rule 4.13). After vegetation and <br />vegetative soil has been stripped, the remaining surface will be benched to prevent the <br />development of a shear plane between colluvium and refuse materials. <br />2. Delete Section 4.3 in its entirety and replace with the following text: <br />4.3 Underdrain <br />The underdrain has been designed and will be constructed in accordance with Rule 4.10.3, more <br />specifically, the alterative underdrain design as provided in Rule 4.10.3(5). <br />Barr Engineering Co. 4700 West 77th Street, Suite 200, Minneapolis, MN 55435 952.832.2600 www.barr.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.