Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 23B <br />Date : 1211312010 <br />User: TAK <br />Agency or organization name : CDRMS <br />Permit or other job action : TR -123 <br />Task description : Rip MDW roads approved in TR - 123 (previously approved PR - 14) <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : <br />Area : <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : -shank ripper <br />Selected estimating method : Area <br />Load factor: NA Bank volume: NA BCY <br />Rip depth (ft) : 2.00 Volume: 5,776 BCY or CCY <br />NA NA <br />1.79 acres <br />Source of estimated quantity : See borehole sheet <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />State : Colorado <br />County : Gunnison <br />Site West Elk Mine <br />NA feet/second <br />NA cu. yds. /hour <br />Unadjusted production <br />per selected method : 1,436.70 cu. yds. /hour <br />Area : Avg. ripping depth : <br />1.00 <br />feet/pass <br />Site altitude : <br />7,100 <br />feet <br />Average ripping width : <br />7.67 <br />feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />500.00 <br />feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed : <br />88.00 <br />feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: <br />0.25 <br />minutes /pass <br />Production per unit area : <br />0.891 <br />acres /hour <br />Adjusted unit production : <br />1,192.46 <br />cu. yds. /hour <br />Unadjusted production : <br />1,436.70 <br />cu. yds. /hour <br />Adjusted fleet production : <br />4,769.83 <br />cu. yds. /hour <br />x <br />JOB TIME AND COST <br />Fleet size : <br />4 <br />dozer(s) <br />Total job time: <br />1.21 <br />hours <br />Unit cost: <br />$0.195 <br />per cu. yd. <br />Total job cost : <br />$1,126 <br />SHOW ,..... �� <br />Permit/job # : C - 80 - 007 <br />Abbreviation : none <br />Filename :C007 -238 <br />