Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 21A <br />Date : 0611112010 <br />User: TAK <br />Permit/job # : C -80 -007 <br />Abbreviation : none <br />Filename : C007 -21A <br />Agency or organization name: CDRMS <br />Permit or other job action : TR -121 <br />Task description : Rip MDW pads approved in TR- 121 (previously approved PR -14) <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />State : Colorado <br />County : Gunnison <br />Site West Elk Mine <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA <br />NA <br />Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 10.99 <br />acres <br />Rip depth (ft) : <br />2.00 Volume: <br />35,461 <br />BCY or CCY <br />Source of estimated quantity <br />Exhibit 80, TR -121, <br />Project Details <br />Source of estimated load factor: NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correction Factors - <br />Seismic : Seismic velocity: <br />NA <br />feet/second <br />Unadjusted production <br />Unadjusted production : <br />NA <br />cu. yds. /hour <br />per selected method : <br />1,436.70 <br />cu. yds. /hour <br />Area : Avg. ripping depth : <br />1.00 <br />feet/pass <br />Site altitude : <br />7,100 <br />feet <br />Average ripping width : <br />7.67 <br />feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />500.00 <br />feet/pass <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Average dozer speed : <br />88.00 <br />feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: <br />0.25 <br />minutes /pass <br />Production per unit area : <br />0.891 <br />acres /hour <br />Adjusted unit production : <br />1,192.46 <br />cu. yds. /hour <br />Unadjusted production : <br />1,436.70 <br />cu. yds. /hour <br />Adjusted fleet production : <br />4,769.83 <br />cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : <br />4 <br />dozer(s) <br />Total job time : <br />7.43 <br />hours <br />Unit cost: <br />$0.195 <br />per cu. yd. <br />Total job cost: <br />$6,912 <br />