Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 211 <br />Date : 0710612010 <br />User: TAK <br />Agency or organization name CDRMS <br />Permit or other job action : TR -121 <br />Task description : Regrade MDW pads approved in TR -121, not previously approved in PR -14 <br />HOURLY EQUIPMENT COST <br />State : Colorado <br />County : Gunnison <br />Site West Elk Mine <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2: 3-shank ripper <br />Data source : ( CRG) <br />Source of estimated volume : 2.0 acres X 10 feet thick <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />2.00 % (pos) <br />7,900 feet <br />Material weight: Z900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />Utilization % <br />Cost Breakdown: Ownership cost/hour : <br />$67.84 <br />NA <br />Operating cost/hour : <br />$119.93 <br />100 <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$226.31 <br />Total fleet cost/hour : $905.25 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume: 3 2,2 6 7 CCY factor : <br />1.1 <br />volume: 37,591 LCY <br />Source of estimated volume : 2.0 acres X 10 feet thick <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />2.00 % (pos) <br />7,900 feet <br />Material weight: Z900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />0.95 <br />0.79 <br />1.00 <br />0.33 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1shift1day) <br />(fnd -rt) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S /SU /U) <br />Adjusted unit production <br />Adjusted fleet production <br />Permit/job# : C -80 -007 <br />Abbreviation : none <br />Filename : C007 -211 <br />406.87 LCY /hr <br />1,627.47 LCY /hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 23.10 Hours <br />Unit cost: $0.556 /LCY Total job cost: $20,909 <br />