My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-01_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-08-01_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:13 PM
Creation date
11/3/2011 4:22:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
8/1/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />Permit or other job action : TR -120 <br />Task description: Remove RPEE road surfacing, haul to main surface facilities <br />HOURLY EQUIPMENT COST T Shift basis: 1 per day <br />Equipment Description <br />Truck/loader team -Truck <br />-Loader: <br />Generic 10 -12 cy, 6x4 <br />CAT 938G (2003) <br />Support equipment -Load area : <br />-Dump area: <br />CAT 938G (2003) <br />Cat D9R - 9SU (2005) <br />Road maintenance -Motor grader <br />-Water truck :1 <br />CAT 14H <br />Water Tanker, 2,500 Gal. <br />Cost Breakdown: <br />Truck/Loader Work Team <br />Truck I Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename: <br />truck2 <br />loader <br />loader <br />dozer <br />grader <br />misctruk <br />% Utilization-machine: <br />100 <br />54 <br />100 <br />100 <br />100 <br />25 <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />0 <br />0 <br />NA <br />Ownership cost/hour : <br />$13.34 <br />$22.39 <br />$22.39 <br />$58.16 <br />$41.79 <br />$8.32 <br />Operating cost/hour : <br />$38.89 <br />$13.26 <br />$24.49 <br />$95.29 <br />$46.26 <br />$3.47 <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />$38.54 <br />$38.54 <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$74.51 <br />$74.19 <br />$85.41 <br />$191.99 <br />$112.54 <br />$50.49 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group subtotals : <br />Work: $372.23 <br />F Support : $277.40 <br />Maintenance : $163.03 <br />Total work team cost/hour : $ 812.65 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 17,776 LCY factor : NA volume: 17,776 LCY <br />Source of quantity take -off : 3.03 miles X 30 ft wide X 1 ft thick <br />Source of estimated swell factor : <br />Material purchase cost: $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pavload (weight) Basis: Truck Bed (volume) Basis: <br />Material weight: 2,900 pounds /LCY Struck volume : <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume: <br />Rated payload : 35,400 pounds Average volume: <br />Payload capacity: 12.21 LCY Adjusted volume': <br />Final truck volume based on number of loader passes : <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: Job Condition Correctioi <br />Rated capacity (nom. heaped) : 3.250 LCY Truck <br />Descr.:Other - rock1birt mixtures (100 -120 %) Altitude adj.: 1.000 <br />Bucket fill factor: 1.100 Job efficiency: 0.830 <br />Adjusted bucket capacity : 3.575 LCY Net correction : 0.830 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />10.73 LCY <br />Site altitude (ft.) : 7,100 <br />Loader <br />Source <br />1. 000 <br />(Cat HB <br />0.830 <br />(1 shift/da: <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.