My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-01_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-07-01_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:07 PM
Creation date
11/3/2011 4:19:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
7/1/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />r <br />PROJECT IDENTIFICATION <br />Task #: 19d State : Colorado Permit/job# : C -80 -007 <br />Date <br />User <br />09/21/2009 <br />TA <br />County : Gunnison <br />Site West Elk Mine <br />Abbreviation : none <br />Filename :C007 -19d <br />Agency or organization name : CDRMS <br />Permit or other job action : TR -119, Pond MB -5E ana <br />Task description : Regrade Pond MB -5E <br />ti <br />HOURLY EQUIPMENT COST <br />associated ditches and culverts <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : per day <br />Attachment no. 2 : -shank ripper <br />Data source : (CRG) <br />Source of estimated volume Exhibit 66, Pond MB -5E, drawing CPP- L005.dwg <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />2.00 % (pos) <br />6,300 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Total job time <br />727.06 LCY /hr <br />2,908.26 LCY /h <br />12.24 Hours <br />Operator skill : <br />Material consistency : <br />Dozing method: <br />Visibility: <br />Job efficiency : <br />Spoil pile: <br />Push gradient : <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />1.00 <br />0.79 <br />1.00 <br />0.34 <br />Utilization % <br />Cost Breakdown: <br />Ownership cost/hour : <br />$67.84 <br />NA <br />(fnd -rf) <br />Operating cost/hour : <br />$119.93 <br />100 <br />(S /SU /U) <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour : <br />$226.31 <br />Total fleet cost/hour : $905.25 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume : 30,555 CCY factor : <br />1.165 <br />volume : 35,597 LCY <br />Source of estimated volume Exhibit 66, Pond MB -5E, drawing CPP- L005.dwg <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />2.00 % (pos) <br />6,300 feet <br />Material weight: 2,900 Ibs /LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Total job time <br />727.06 LCY /hr <br />2,908.26 LCY /h <br />12.24 Hours <br />Operator skill : <br />Material consistency : <br />Dozing method: <br />Visibility: <br />Job efficiency : <br />Spoil pile: <br />Push gradient : <br />Altitude : <br />Material weight: <br />Blade type : <br />Net correction : <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />0.97 <br />1.00 <br />0.79 <br />1.00 <br />0.34 <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1shift1day) <br />(fnd -rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S /SU /U) <br />Adjusted unit production <br />Adjusted fleet production <br />Unit cost : $0.311 /LCY Total job cost: $11,080 <br />�=---7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.