Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : eee <br />Date : 0211812010 <br />User: TAK <br />Agency or organization name DRMS <br />Permit or otherjob action : MR -361 (holes incrementally permitted in PR -14) <br />Task description Regrade drill pads for holes 2010 - 1 and 2 (MDWs E6 - 63 and E7 - 68) <br />HOURLY EQUIPMENT COST <br />State : Colorado <br />County : Gunnison <br />Site West Elk Mine <br />Basic machine Cat D9R - 9SU (2005) Horsepower: 405 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />Data source : (CRG) <br />Permit/job# : C -80 -007 <br />Abbreviation : none <br />Filename : C007 -eee <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : <br />$67.84 <br />NA <br />Operating cost/hour : <br />$119.93 <br />100 <br />Ripper op. cost/hour : <br />$0.00 <br />0 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour: <br />$226.31 Total <br />fleet cost/hour <br />: $905.25 <br />W <br />IVA ._a .. .. <br />_ .. <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume: 14,520 CCY factor : <br />1.165 volume: <br />16,916 <br />LCY <br />Source of estimated volume : 0.90 acre X 10 feet thick <br />_ <br />Source of estimated swell factor: NA <br />.... <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill : <br />a 75 <br />(avg.) <br />Average push distance : 50 feet <br />Material consistency: <br />1.00 <br />(Cat HB)_ <br />Unadjusted hourly production: 2,110.5 LCY /hr <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description : <br />Job efficiency : <br />0.83 <br />(lshift/day) <br />Consolidated stockpile <br />Spoil pile: <br />0.80 <br />(fnd -r� <br />Push gradient: <br />0.90 <br />(Cat HB) <br />Average push gradient: 5.00 % (pos) <br />Altitude : <br />0.95 <br />(Cat HB) <br />Average site altitude : 8,300 feet <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U)_ <br />Material weight: 2,900 Ibs /LCY <br />Net correction : <br />0.34 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Adjusted unit production : <br />715.26 <br />LCY /hr <br />A djusted fleet pro duction : <br />2,861.05 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Total job time: <br />5.91 <br />Hours <br />Unit cost: $0.316 /LCY <br />To jo b cost: <br />$5,352 <br />s <br />Permit/job# : C -80 -007 <br />Abbreviation : none <br />Filename : C007 -eee <br />