My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-17_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-07-17_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:45 PM
Creation date
11/3/2011 4:16:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
7/17/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />Permit or other job action : TR -120 <br />Task description Haul n <br />HOURLY EQUIPMENT COST Shift basis : - I per day <br />l .,,,nm ono n-rinlinn <br />Truck/loader team -Truck <br />-Loader: <br />CIRCES Cost Estimating <br />Software <br />Support equipment -Load area :CAT <br />-Dump area <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />d <br />CAT 14H <br />Agency or organization name CDRMS <br />Cost Breakdown : <br />Task # : 20A <br />State : Colorado <br />Permit/job # C -80 -007 <br />Date : 0412612010 <br />County : Gunnison <br />Abbreviation : none <br />User: TAK <br />Site West El Mine <br />Filename : C007 -20A <br />Permit or other job action : TR -120 <br />Task description Haul n <br />HOURLY EQUIPMENT COST Shift basis : - I per day <br />l .,,,nm ono n-rinlinn <br />Truck/loader team -Truck <br />-Loader: <br />Generic 10 -12 cy, 6x4 <br />CAT 938G (2003) <br />Support equipment -Load area :CAT <br />-Dump area <br />938G (2003) <br />Cat D9R - 9SU (2005) <br />Road maintenance -Motor grader <br />-Water truck :1 <br />CAT 14H <br />Water Tanker, 2,500 Gal. <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />loader <br />dozer <br />grader <br />misctruk <br />% Utilization- machine : <br />100 <br />30 <br />100 <br />100 <br />100 <br />25 <br />- Ripper attachment: <br />NA <br />NA <br />NA <br />0 <br />0 <br />NA <br />Ownership cost/hour : <br />$13.34 <br />$22.39 <br />$22.39 <br />$58.16 <br />$41.79 <br />$8.32 <br />Operating cost/hour : <br />$38.89 <br />$7.42 <br />$24.49 <br />$95.29 <br />$46.26 <br />$3.47 <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.29 <br />$38.54 <br />$38.54 <br />$38.54 <br />$24.50 <br />$38.70 <br />Unit subtotals : <br />Number of units : <br />$74.51 <br />$68.35 <br />$85.41 <br />$191.99 <br />$112.54 <br />$50.49 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group subtotals : <br />Work : $366.39 <br />Support: $277.40 <br />Maintenance: $163.03 <br />Total work team cosvnour : oduoxx <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,000 LCY factor : NA volume: 10,000 LCY <br />Source of quantity take -off : Section 7, Exhibit 82 <br />Source of estimated swell factor: NA <br />Material purchase cost: $0.00 /LCY Total cost: $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: Truck Bed (volume) Basis: <br />Material weight: 2,900 pounds /LCY Struck volume : 10.00 LCY <br />Descr.: Deco rock - 50% Rock, 50% Earth Heaped volume: 12.00 LCY <br />Rated payload <br />Payload capacity <br />waste rock from prep. plant to RPEE <br />35,400 pounds Average volume: 11.00 LCY <br />12.21 LCY Adjusted volume': 12.00 LCY <br />Final truck volume based on number of loader passes : 10.73 LCY <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: <br />1.000 <br />(Cat HB) <br />Jot) uonaition correcuot <br />Rated capacity (nom. heaped) : <br />3.250 LCY <br />Truck <br />Descr.: Other - rock/dirt mixtures <br />(100 -120 %) <br />Altitude adj.: <br />1.000 <br />Bucket fill factor : <br />1.100 <br />Job efficiency: <br />0.830 <br />Adjusted bucket capacity: <br />3.575 LCY <br />Net correction : <br />0.830 <br />Site altitude (ft.) : 7,100 <br />Loade Source <br />1.000 <br />(Cat HB) <br />0.830 <br />(1 shift/day) <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.