My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-06-20_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:38 PM
Creation date
11/3/2011 4:11:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Demolish structures approved in MR -376 <br />Site: West Elk Mine Permit Action: MR -376 Permit/Job #: C1980007 <br />PROJECT IDENTIFICATION <br />Task #: B76 State: Colorado <br />Date: 6/20/2011 County: Gunnison <br />User: TAIL <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C007 -b76 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />76a <br />Demolish concrete wall to protect ST -5 escape <br />DEMOLISH <br />1 <br />0.44 <br />$882.87 <br />Profit: <br />tunnel fan <br />Total = <br />$88.29 <br />TOTAL O &P= <br />SUBTOTALS: <br />0.44 <br />$ $882.87 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />0.00 <br />Total = <br />$0.00 <br />Performance bond: <br />0.00 <br />Total = <br />$0.00 <br />Job superintendent: <br />0.22 <br />Total = <br />$12.88 <br />Profit: <br />10.00 <br />Total = <br />$88.29 <br />TOTAL O &P= <br />$101.17 <br />CONTRACT AMOUNT (direct + O & P) = <br />$984.04 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.25 <br />Total = $41.82 <br />Reclamation management and/or administration: <br />3.25 <br />$31.98 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $174.97 <br />TOTAL BOND AMOUNT (direct + indirect) = $1,057.84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.