My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1980007A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2011-06-20_PERMIT FILE - C1980007A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:38 PM
Creation date
11/3/2011 4:11:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Doc Name
Cost Summary
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 4
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 21H State : Colorado Permit/job # C -80 -007 <br />Date <br />User <br />0710612010 <br />TAK <br />County : Gunnison <br />Site West Elk Mine <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : -shank ripper <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 5.54 acres Rip depth (ft) <br />Selected estimating method : Area <br />NA Bank volume <br />2.00 Volume <br />NA BCY <br />17,876 BCY or CCY <br />Source of estimated quantity Exhibit 80, TR -121, Project Details <br />Source of estimated load factor NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />NA <br />feet/second <br />NA <br />cu. yds. /hour <br />1.00 <br />feet/pass <br />7.67 <br />feet/pass <br />500.00 <br />feet/pass <br />88.00 <br />feet/minute <br />0.25 <br />minutes /pass <br />0.891 <br />acres /hour <br />Unadjusted production: 1,436.70 cu. yds. /hour <br />JOB TIME AND COST <br />Fleet size : 4 dozers) <br />Unadjusted production <br />per selected method : <br />1,436.70 <br />cu. yds. /hour <br />Site altitude : <br />7,100 <br />feet <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Job efficiency factor: <br />0.83 <br />(1 shift/day) <br />Net job correction : <br />0.83 <br />multiplier <br />Adjusted unit production : <br />1,192.46 <br />cu. yds. /hour <br />Adjusted fleet production : <br />4,769.83 <br />cu. yds. /hour <br />Total job time : <br />3.75 <br />hours <br />Abbreviation : none <br />Filename :0007 -21H <br />Unit cost : $0.195 per cu. yd. Total job cost: $3,484 <br />
The URL can be used to link to this page
Your browser does not support the video tag.