Truck/Loader Team Work cont'd Task # : 20M sheet 2 of 2 <br />v <br />Loading Tool Cycle Time: Number of loading tool passes required to fill truck : �2 passes <br />Excavators and front shovels - machine cycle time vs. job condition rating : NA <br />- selected value within basic rating : NA <br />Track loaders - material descr.: NA <br />- cycle time elements (min.) : Load <br />NA <br />Maneuver: NA <br />Dump: 0.100 <br />Wheel and track loaders - unadjusted basic loader cycle time ( load, maneuver, and duml 0.525 minutes <br />Cycle Time Factors <br />Loading Condition Description <br />Factor (min.) <br />Source <br />Material : <br />Mixed material <br />0.020 <br />(Cat HB) <br />Stockpile <br />Conveyor or dozer piled 10 ft. high or less <br />0.010 <br />(Cat HB) <br />Truck ownership <br />Common ownership of trucks and loaders <br />-0.040 <br />(Cat HB) <br />Operation : <br />Constant operation <br />-0.040 <br />(Cat HB) <br />Dump target :Nominal <br />target <br />0.000 <br />(Cat HB) <br />Road <br />segment# <br />Net cycle time aajustmem : <br />-v.vov <br />nnnuics <br />Total <br />resistance ( %) <br />Adjusted loader cycle time (total time per loader pass) : <br />0.475 <br />minutes <br />7,920 <br />Net load time per truck * : <br />0.575 <br />minutes <br />Truck Cycle Time: <br />* bulk of 1st loader cycle completed during truck exchange if adj. loader cycle time < exchange time <br />118.41 <br />Truck exchange time * *: <br />0.50 minutes........ Adjusted for site altitude : <br />0.500 <br />minutes <br />Truck load time: <br />0.575 minutes........ Adjusted for site altitude : <br />0.575 <br />minutes <br />Truck maneuver and dump time: <br />0.80 minutes........ Adjusted for site altitude : <br />0.800 <br />minutes <br />— set at 0 if exchange time < adj. loader cycle time (truck exchange completed during 1 st loader cycle) <br />Fleet size : <br />Truck travel (haul & return) time: <br />Road condition : Rutted dirt, little maintenance, no <br />water, 2" tire penetration <br />W­ it — rto <br />$3.252 /LCY Total job cost: <br />$115,602 <br />Road <br />segment# <br />Haul distance <br />(feet) <br />Grade <br />res. ( %) <br />Rolling <br />res. ( %) <br />Total <br />resistance ( %) <br />Speed <br />(feet/minute) <br />Travel time <br />(minutes) <br />1 <br />7,920 <br />5.00 <br />5.00 <br />10.00 <br />1068 <br />7.430 <br />118.41 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />118.41 <br />LCY /hr <br />Adjusted hourly multiple truck/loader team production : <br />118.41 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 Team(s) Total job time : <br />300.24 <br />Hours <br />Unit cost : <br />$3.252 /LCY Total job cost: <br />$115,602 <br />Return route : Haul time ** : 7.430 minutes <br />minutes <br />minutes <br />Loading tool unit production : <br />399.07 LCY /hour...... Adjusted for job efficiency: <br />331.23 <br />LCY /hour <br />Truck unit production : <br />35.67 LCY /hour...... Adjusted for job efficiency : <br />29.60 <br />LCY /hour <br />Optimal no. trucks /loading tool : <br />11 trucks........... Selected no. trucks /loader : <br />4 <br />trucks <br />Adjusted hourly truck team production : <br />118.41 <br />LCY /hr <br />Adjusted hourly single truck/loader team production : <br />118.41 <br />LCY /hr <br />Adjusted hourly multiple truck/loader team production : <br />118.41 <br />LCY /hr <br />JOB TIME AND COST <br />Fleet size : <br />1 Team(s) Total job time : <br />300.24 <br />Hours <br />Unit cost : <br />$3.252 /LCY Total job cost: <br />$115,602 <br />travel time shown for each segment includes acceleration /deceleration adjustment Return time * * : 2.723 <br />"total haul and return time shown includes altitude adjustment Total truck cycle time : 12.028 <br />