My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-29_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-09-29_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:29 PM
Creation date
11/3/2011 3:19:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
9/29/2011
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• For construction of the Bates Portal light use roads, all vegetation material and topsoil will be <br />removed from the design road bed, shoulders, and surfaces where associated structures will be <br />placed. Topsoil will be placed in one of the topsoil stockpiles located on site. Vegetation shall <br />not be cleared for more than the width necessary to serve traffic and utility needs. Compaction <br />on the embankment shall be required only to the extent necessary to control erosion and maintain <br />the road. <br />Temporary erosion control measures shall be implemented during embankment construction to <br />control sedimentation and minimize erosion until permanent control measures can be established. <br />After construction is complete the area disturbed will be seeded and mulched to reduce the rate <br />and volume of run -off. <br />Light Use Road Drainage <br />The Bates Portal light use road is designed, and shall be maintained to have adequate drainage, <br />using ditches and culverts. The water control system is designed to safely pass peak runoff from <br />a 10 -year, 24 -hour precipitation event. The drainage design for the Bates Portal light use road is <br />shown on Map 13a. <br />No surfacing will be utilized for the light use roads. The light use roads will be maintained <br />adequate for the intended use of the roads. A light use road damaged by a catastrophic event will <br />be repaired as soon as is practicable after the damage has occurred. <br />Light Use Road Reclamation <br />• The Bates Portal light use road will be reclaimed in conjunction with the reclamation and <br />backfilling of the Bates Portal. <br />TR -55 2.05 -7c 03/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.