My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-26_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-09-26_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:43:23 PM
Creation date
11/3/2011 12:17:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
9/26/2011
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56 PR3)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rock Dust Delivery System <br />The underground rock dust delivery system includes a rock dust storage silo or bin, compressor and pressure vessel. <br />The rock dust sytem is located on Map 11, Sheet 3 —East Portal Facilities. <br />Refer to Figures 6 and 7 for details of the structures. <br />Site Plan Area: Rock Dust Bin <br />Item <br />Concrete <br />Bin Units <br />Length (ft) <br />12 <br />Width (ft) <br />Width (ft) <br />12 <br />Depth/height (ft) <br />12 <br />10 <br />Quantity <br />64 <br />3,000 <br />Units <br />CY <br />LBS <br />Unit cost <br />$74 <br />$0.13 <br />Total direct cost <br />$4,736 <br />$399 <br />Job supervision hours <br />8 <br />9 <br />Job supervision cost <br />$333 <br />$375 <br />% of direct costs (Includes profit, insurance, bond) <br />$619 <br />$52 <br />Contract <br />$5,688 <br />$826 <br />Engineering <br />$242 <br />$35 <br />Reclamation management <br />$284 <br />$41 <br />Estimated bond <br />$6,215 <br />$903 <br />Site Plan Area: Rock Dust Compressor and Tank <br />• <br />Item House Concrete Units Tank Units <br />Length (ft) <br />20 <br />20 <br />Width (ft) <br />20 <br />20 <br />Depth/height (ft) <br />10 <br />2 <br />Quantity <br />800 <br />30 <br />3,000 <br />3000 <br />Units <br />CF <br />CY <br />LBS <br />LBS <br />Unit cost <br />$0.13 <br />$74.00 <br />$0.13 <br />$0.13 <br />Total direct cost <br />$106 <br />$2,193 <br />$399 <br />$399 <br />Job supervision hours <br />8 <br />9 <br />10 <br />11 <br />Job supervision cost <br />$333 <br />$375 <br />$417 <br />$458 <br />% of direct costs (Includes profit, insurance, bond) <br />$14 <br />$287 <br />$52 <br />$52 <br />Contract <br />$454 <br />$2,854 <br />$868 <br />$910 <br />Engineering <br />$19 <br />$121 <br />$37 <br />$39 <br />Reclamation management <br />$23 <br />$143 <br />$43 <br />$45 <br />Estimated bond <br />$496 <br />$3,118 <br />$948 <br />$994 <br />TR 54 <br />Exhibit 28 —Page 136 <br />Revised 11 -03 -2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.