Laserfiche WebLink
Site Plan Area: Topsoil & Seed Well Area & Road <br />Item <br />Re grade <br />Reseeding <br />Quantity <br />7 <br />0.01 <br />Swell @ 1.125 <br />1.125 <br />1 <br />Quantity <br />7.875 <br />0.01 <br />Units <br />CY <br />Acres <br />Unit cost <br />1.03 <br />469.56 <br />Total direct cost <br />$8 <br />$5 <br />Job supervision hours <br />1 <br />1 <br />Job supervision cost <br />$42 <br />$42 <br />Profit, insurance, and bond <br />12.60% <br />$1 <br />$1 <br />Contract = Direct + Overhead <br />$51 <br />$47 <br />Engineering 4.25% of Contract <br />$2 <br />$2 <br />Reclamation management @6.0% <br />of Contract <br />$3 <br />$3 <br />Estimated bond <br />$56 <br />$52 <br />PR -02 Exhibit 28 -Page 179 05111 <br />