Laserfiche WebLink
• <br />• <br />Probable Hydrologic Consequences New Elk Mine 94 <br />Test 1 <br />ZOO <br />Is, <br />ns <br />150 <br />1]5 <br />1$5 <br />i <br />g 100 � <br />q 165 <br />8 so 9 <br />I55 <br />]5 y <br />0 s l0 11 20 25 3o js us <br />Elapsed Time (minutes) 1° <br />1]s <br />150 <br />125 <br />vi IW <br />g n <br />i <br />e so <br />25 <br />C <br />o <br />0 <br />ISO <br />125 <br />S 1M <br />n <br />6 <br />50 <br />a <br />p( xs <br />6 ° <br />0 <br />5 10 15 ]0 25 30 <br />Elapsed Time (minutes) <br />110 , <br />Test 1 <br />14 <br />16 <br />Flow (gpml <br />Test 2._. -.. <br />la 30 <br />S I60 <br />6_1 <br />x I50 <br />O <br />140 <br />28 30 32 3e 36 38 40 <br />Flaw(gpm) <br />150 I Test 3 <br />140 <br />L <br />a <br />130 <br />y 120 <br />a <br />'u <br />n0 <br />6 <br />10 "_0 11 <br />Elapsed Time(minuleo 0S 10 12 14 16 le 20 <br />Flow(gpm) <br />Figure B - 1. P lots of Packer Test Response in Borehole NE -1 -10 <br />• <br />411"A.110130 WhetstoneAnotiatei 1 <br />PR 02 Exhibit 8(4) Page 164 Revised 1/31/11 <br />