Laserfiche WebLink
List of Tables (Continued) <br />Page <br />Table 29 Parameters of Column Leach Tests ................................ ............................... ........................2.05 -65 <br />Table 30 Leaching Data for Coal Refuse ...................................... ............................... ........................2.05 -67 <br />Table 31 Results of Chemical Analysis ........................................ ............................... ........................2.05 -70 <br />Table 32 Time Variation of Quality of Effluent from Backfill Channel ...................... ........................2.05 -74 <br />Table 33 Effect of Backfill Quality of Alluvial Groundwater ...... ............................... ........................2.05 -77 <br />List of Figures <br />Page <br />Figure 1 Generalized Stratigraphic Section of the Permit Area .......................................................... 2.04 -10a <br />Figure 1 a Regional Map Showing Location of Project Area, Previous Survey and Cultural Features .2.04 -6 <br />Figure 2 Estimated Life -of -Mine Plan Area ................................ ............................... .........................2.05 -4 <br />Figure 2a Water Distribution Typical Vault Construction Detail ................................. ........................2.05.5b <br />Figure 2b Typical Concrete Encased Electrical Duct Bank Construction ..................... ........................2.05.5d <br />Figure 2c Apache, Canyon Airshafts ............................................. ............................... .........................2.05 -8 <br />Figure 2d Substation and Rock Dust System Cut Runoff Routing Detail .................... .........................2.05 -10b <br />Figure 2e Development Waste Disposal Area Runoff Routing Detail ........................... .......................2.05 -10d <br />Figure 2f Runoff Routing Detail — Bates Portal and Reclamation Area ........................ .......................2.05 -10e <br />Figure 3 Typical Embankment Cross Section .............................. ............................... ........................2.05 -12 <br />Figure4 Water Flow Sheet ........................................................... ............................... ........................2.05 -13 <br />Figure 5 Pond 001 Design (TR -49) ............................................... .......................:....... .......................2.05 -16a <br />Figure 5a Pond 001 Design ( TR- 49) ............................................... ............................... .......................2.05 -16b <br />Figure 5b Layout and cross sections of subsoil storage area ........... ............................... .......................2.05 -23a <br />Figure 6 Proposed RDA Configuration ............................ ............................... <br />........... ......................... 2.05-30 <br />Figure 7 RDA Conceptual Fill Configuration .............................. ............................... ........................2.05 -31 <br />Figure 8 RDA Generalized Cross Section .................................... ............................... ........................2.05 -32 <br />Figure 9 RDA Benched Keyway Cut ........................................... ............................... ........................2.05 -33 <br />Figure 10 This Figure Deleted by TR -41 ....................................... ............................... ........................2.05 -34 <br />Figure 11 RDA Cross Section A -A' Final Configuration ............... ............................... ........................2.05 -35 <br />Figure 12 Grain Size Distribution, Coal Processing Waste ............ ............................... ........................2.05 -38 <br />Figure 13 Plan and Detail of Proposed Development Waste Disposal Area .................. .......................2.05 -44a <br />Figure 13a Approximate Original Contour Section for the Rock Dust Bin Cut Area ...... .......................2.05 -46b <br />Figure 13b Approximate Original Contour Sections for the Bates Portal Area ............... .......................2.05 -46c <br />Figure 14 Cut Slope Detail with Map 15 References Showing Disturbance Boundary Change ........... 2.05 -46c <br />Figure 1.4a Bates Portal Slope and Reclamation Area Detail with Map 15 References <br />ShowingDisturbance ...................................................... ............................... .......................2.05 -46e <br />Figure 15 Typical Lower Permanent Seal ...................................... ............................... ........................2.05 -52 <br />Figure 15a Piping for Recycling of Slurry ........................................ ............................... .......................2.05 -52a <br />Figure16 Typical Airshaft Seal ..................................................... ............................... ........................2.05 -53 <br />Figure16a Typical Borehole Seal ..................................................... ............................... .......................2.05 -53a <br />Figure 17 Raptor Proof Powerpole Design .................................... ............................... ........................2.05 -56 <br />Figure 17a Raptor Proof Pole West Portal Power Line ..................... ............................... .......................2.05 -56a <br />Figure 18 Electrical Conductivity as a Function of Effluent Volume ........................... ........................2.05 =68 <br />Figure 19 Detail of Mine Plan and Subsidence Related Features ... ............................... ........................2.05 -92 <br />PR -02 Page v Revised 6/11 <br />