Laserfiche WebLink
EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />SEDIMENT STORAGE CAPACITY <br />iO\A <br />Qualified Imp undment Inspector <br />Date <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter 2011 <br />Inspection Date: 06/27/11 <br />Explain: <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />General Description or Reference to Site Plan: <br />Pond 6 is a non - discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean -out. <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Excellent Moderate <br />Extensive Some <br />Yes <br />Few <br />Poor <br />No <br />Yes No !/ <br />Yes No !/ <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No L---- <br />OTHER OBSERVATIONS: /f4) )2A5 h ep "�� <br />