Laserfiche WebLink
Total acres <br />backfilled: <br />la-4- <br />Total acres <br />seeded w/ <br />approved mix: <br />i 5 4- <br />"" <br />Total acres <br />w /topsoil <br />replaced: <br />15 + <br />i/ <br />6 <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons): <br />v <br />(S <br />c <br />To 6e.rw <br />0,0 <br />Total acres <br />graded: <br />1 } - <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />o o_ Topsoil <br />0 <br />replacement <br />depth (in.): <br />Seed <br />application <br />method: <br />G 17. r-■\\ <br />Fertilizer <br />application <br />method: <br />p ..,, P w <br />rn ��S o- <br />Mulch <br />application <br />method: <br />P4-o pow et <br />mA <br />Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, is advisable that the issues - b'e rectified - promptlyto - avoid possible --- <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1) NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) ® NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? J,.y 2 . 0 /C) <br />5. Does the mine operate more or less than 180 days per year? MORE <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. 0 <br />9. Number of acres that were reclaimed during the current report year. 4- t <br />10. Estimated new acreage to be affected in the next report year. 0 <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />P e r m s : n w 0. S <br />- <br />to,re- a'-e -c. 4o(p SO: 1 <br />' (& , Fe4 o zt � <br />Seal tvwic.,L tT <br />�e (� <br />9 Old , p e <br />-(o dr cb.,,d;44(),s , <br />l��ecL <br />