My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-28_REVISION - M1986002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2011-10-28_REVISION - M1986002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:24 PM
Creation date
11/3/2011 7:47:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
REVISION
Doc Date
10/28/2011
Doc Name
Adequacy review & cost summary for CN-01
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
CN1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Craig Ranch Pit <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 10/26/2011 County: Mesa <br />User: THM <br />Cost Breakdown: <br />Agency or organization name' DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II LGP <br />Horsepower: 238 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $169.05 <br />Total Fleet Cost/Hour: $169.05 <br />MATERIAL QUANTITIES <br />Initial Volume: 4,000 <br />Swell factor: 1.180 <br />Loose volume: 4,720 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 75 feet <br />Unadjusted hourly production: 594.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />0% <br />4,700 feet <br />Material weight: 2,400 lbs/LCY <br />Weight description: Clay and gravel - Dry <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Regrade near vertical side slopes to 3H:1V <br />$46.30 <br />$84.27 <br />$0.00 <br />$38.49 <br />0.750 <br />0.900 <br />1.000 <br />BULLDOZER WORK <br />Permit Action: CN -01 Permit/Job #: M1986002 <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source <br />(AVG.) <br />(CAT HB)) <br />(GEN.) <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M002 -02a <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.