Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O la <br />02a <br />03a <br />04a <br />05a <br />06a <br />Remove Scale 20' x 70' <br />DEMOLISH <br />- , N N v-. ---- <br />4.00 <br />$8,366.73 <br />$3,125.23 <br />$42,127.36 <br />$46,686.60 <br />$61,835.85 <br />$7,275.46 <br />Regrade near vertical side slopes to 3H:1V <br />DOZER <br />18.49 <br />Fiinish placement of overburden and wash fines <br />SCRAPER1 <br />27.68 <br />Bring topsoil -from stockpile, place topsoil on 30 <br />acres <br />SCRAPER1 <br />30.68 <br />Revegetation of 30 acres <br />REVEGE <br />24.00 <br />Mobilization <br />MOBILIZE <br />2.62 <br />SUBTOTALS: <br />107.47 <br />$ $169,417.23 <br />Task description: <br />Site: Craig Ranch Pit <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 10/26/2011 County: Mesa <br />User: THM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $3,422.23 <br />Performance bond: 1.05 Total = $1,778.88 <br />Job superintendent: 53.74 Total = $3,186.49 <br />Profit: 10.00 Total = $16,941.72 <br />TOTAL 0 & P = $25,329.32 <br />CONTRACT AMOUNT (direct + 0 & P) = $194,746.55 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />COST SUMMARY <br />Permit Action: CN -01 Permit/Job #: M1986002 <br />500.00 <br />4.25 <br />5.00 <br />Abbreviation: None <br />Filename. M002 -001 <br />Total = 500.00 <br />Total = $8,276.73 <br />$9,737.33 <br />CONTINGENCY: 3.00 Total = $5,082.52 <br />TOTAL INDIRECT COST = $48,925.89 <br />TOTAL BOND AMOUNT (direct + indirect) = $218,343.12 <br />