My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-01_REVISION - P2008046 (6)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2011-11-01_REVISION - P2008046 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:32:09 AM
Creation date
11/3/2011 7:39:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
11/1/2011
Doc Name
Submittal of MD-06 to NOI form 2
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD6
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P -2008 - 046 <br />AMSO Notice of Intent <br />MODIFICATION 06 <br />October 2011 <br />Form 2 — Public <br />Section IV OPERATION AND RECLAMATION MEASURES <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br />abandonment procedures): <br />The plugging and abandonment procedure for any drill hole or monitoring well where logging or <br />other information indicates that the top of the annulus cement placed outside the longstring casing <br />is below the ground surface will be as follows: <br />1. Determine the free point of the longstring casing using conventional methods. <br />2. Remove inner tubing(s) as necessary to allow access to the free point. <br />3. Cut and remove the longstring casing at or slightly above the free point. <br />4. Pump and place a cement - bentonite (bentonite not to exceed 5% dry weight) grout into the <br />remaining longstring casing and open hole above free point. Bring grout to surface and top -off <br />as needed. <br />5. Remove cellar ring and cut surface casings below existing grade. <br />6. Set well monument marker, if required, and regrade and reclaim surface. <br />If the longstring casing cannot be removed above the free point, then the casing will be plugged <br />with cement - bentonite grout and the annulus will be plugged as best possible using surface tremie <br />methods. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.