My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_PERMIT FILE - C1981028A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028A
>
2011-09-07_PERMIT FILE - C1981028A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:58 PM
Creation date
11/2/2011 3:21:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
9/7/2011
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Haul 165,210 cu. yd topsoil to Pit B <br />Site: Keenesburg Strip Mine Permit Action: RN6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 07A State: Colorado Abbreviation: None <br />Date: 8/16/2011 County: Weld Filename: CO28 -07a <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14H <br />-Water Truck: Water Tanker, 3,500 Gal. <br />r...* R. nnbrinwn. 0--pr Wnrlr Tanm Gtnnnrt Frntinmemt Maintenance Eauinment <br />Total work team cost/hour: $1,475.45 <br />MATERIAL OUANTITIES <br />Initial volume: 165,210 CCY Swell factor: 1.060 <br />Loose volume: 175,123 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$91.74 <br />NA <br />NA <br />NA <br />$34.52 <br />$10.94 <br />Operating cost/hour: <br />$202.41 <br />NA <br />NA <br />NA <br />$13.93 <br />$7.58 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$38.67 <br />NA <br />NA <br />NA <br />$38.49 <br />$38.70 <br />Unit Subtotals: <br />$332.82 <br />NA <br />NA <br />NA <br />$86.95 <br />$57.22 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,331.28 <br />Support: <br />$0.00 <br />Maint: <br />$144.17 <br />Total work team cost/hour: $1,475.45 <br />MATERIAL OUANTITIES <br />Initial volume: 165,210 CCY Swell factor: 1.060 <br />Loose volume: 175,123 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,8501bs /LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Sand - Damp <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />75,000 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />26.32 LCY <br />Adjusted Capacity: <br />26.32 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.