Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 061 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />N <br />M <br />(fpm) <br />Time <br />min <br />1 <br />3400.00 <br />1.00 <br />3.00 <br />4.00 <br />2665 <br />1.376 <br />Haul Time: <br />Return Route: <br />1.376 <br />minutes <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />3400.00 <br />-1.00 <br />3.00 <br />2.00 <br />2905 <br />1.199 <br />Loading Tool unit <br />Production 364.80 <br />Truck Unit Production <br />87.69 <br />Optimal No. of Trucks: 4 <br />Return Time: 1.199 <br />Total Truck Cycle Time: 4.443 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 291.13 <br />Adjusted single truck/loader team production: 291.13 <br />Adjusted multiple truck/loader team production: 291.13 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $1.418 /LCY Total job cost: <br />minutes <br />minutes <br />302.79 LCY/Hour <br />4 <br />78 LCY/Hour <br />Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />1.67 Hours <br />$689.35 <br />CIRCES Cost Estimating Software <br />