Laserfiche WebLink
Pagel of 3 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean sediment from Pond 2, dispose in Pit B <br />Site: Keenesburg Strip Mine Permit Action: RN6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 061 State: Colorado <br />Date: 8/17/2011 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Equipment Description <br />Truck Loader Team - Truck: Generic 8 -10 cy, 6x4 <br />- Loader: Cat 320C L <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Abbreviation: None <br />Filename: CO28 -061 <br />Shift basis: 1 per day <br />NA <br />NA <br />CAT 14H <br />Water Tanker, 3,500 Gal. <br />Sunnort Eauinment <br />Maintenance Eauinment <br />Total work team cost/hour: $412.95 <br />MATERIAL OUANTITIES <br />Initial volume: 486 <br />Loose volume: 486 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.000 <br />LCY <br />Coors Site Plan; assume 4" deep sediment <br />Cat Handbook <br />$0.00 <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,400 Pounds /LCY <br />Description: Sand and gravel - Wet <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 8.02 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />. Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$9.28 <br />$22.58 <br />NA <br />NA <br />$34.52 <br />$10.94 <br />Operating cost/hour: <br />$41.86 <br />$41.66 <br />NA <br />NA <br />$13.93 <br />$7.58 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.67 <br />NA <br />NA <br />$38.49 <br />$0.00 <br />Unit Subtotals: <br />$51.14 <br />$102.92 <br />NA <br />NA <br />$86.95 <br />$18.52 <br />Number of Units: <br />4 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: $307.48 <br />Support: $0.00 <br />Maint: $105.47 <br />Total work team cost/hour: $412.95 <br />MATERIAL OUANTITIES <br />Initial volume: 486 <br />Loose volume: 486 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.000 <br />LCY <br />Coors Site Plan; assume 4" deep sediment <br />Cat Handbook <br />$0.00 <br />$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,400 Pounds /LCY <br />Description: Sand and gravel - Wet <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 8.02 LCY <br />CIRCES Cost Estimating Software <br />