My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_PERMIT FILE - C1981028A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028A
>
2011-09-07_PERMIT FILE - C1981028A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:58 PM
Creation date
11/2/2011 3:21:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
9/7/2011
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 3 <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Task description: Mobilization/demobilization of equipment <br />Site: Keenesburg Strip Mine Permit Action: RN6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 059 State: <br />Date: 8/18/2011 County: <br />User: JHB <br />Colorado <br />Weld <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Abbreviation: None <br />Filename: CO28 -059 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />$32.32 <br />(TONS) <br />$32.32 <br />$32.32 <br />fleet <br />Cat D9R -9SU <br />66.73 <br />$57.16 <br />$125.45 <br />1 <br />$182.61 <br />$125.45 <br />$250.00 <br />2005) <br />CAT 14H <br />20.71 <br />$34.52 <br />$88.67 <br />2 <br />$246.39 <br />$177.34 <br />$0.00 <br />ATLAS COPCO <br />0.00 <br />$51.56 <br />$88.67 <br />1 <br />$140.23 <br />$88.67 <br />$0.00 <br />ROC D7- 11,4.0 in. <br />Cat 637G w /push- <br />59.08 <br />$91.74 <br />$125.45 <br />4 <br />$868.74 <br />$501.80 <br />$1,000.00 <br />pull <br />Cat 320C L <br />21.72 <br />$22.58 <br />$88.67 <br />1 <br />$111.25 <br />$88.67 <br />$0.00 <br />CAT 966G 2002 <br />25.10 <br />$27.48 <br />$88.67 <br />1 <br />$116.15 <br />$88.67 <br />$0.00 <br />Grove RT530E, <br />28.74 <br />$23.95 <br />$117.55 <br />1 <br />$141.50 <br />$117.55 <br />$0.00 <br />95', 27.2MT <br />Drill /Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$0.00 <br />Seeder with Tractor <br />Subtotals: 1 $1,935.13 $1,276.82 1 $1,250.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Water Tanker, 3,500 Gal. <br />$79.96 <br />1 <br />$79.96 <br />$79.96 <br />Light duty pickup 4x4 IT Crew <br />$21.46 <br />1 <br />$21.46 <br />$21.46 <br />Fuel Tanker, 4x2, 170 HP <br />$32.32 <br />1 <br />$32.32 <br />$32.32 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.