My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-09-07_PERMIT FILE - C1981028A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981028A
>
2011-09-07_PERMIT FILE - C1981028A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:58 PM
Creation date
11/2/2011 3:21:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028A
IBM Index Class Name
Permit File
Doc Date
9/7/2011
Doc Name
Miscellaneous - Includes Reclamation Cost Estimate
Section_Exhibit Name
APPENDIX S MISCELLANEOUS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Task # 45A <br />1.00 Minutes <br />0.60 Minutes <br />Page 2 of 2 <br />Site Altitude: 4000 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />U —I P—f- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB <br />Page 2 of 2 <br />Site Altitude: 4000 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />U —I P—f- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(fin) <br />1 <br />2300.00 <br />0.00 <br />3.00 <br />3.00 <br />2800 <br />1.13 <br />Haul Time: 1.13 minutes <br />T2afi,— P—t- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />%) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2300.00 <br />0.00 <br />3.00 <br />3.00 <br />2949 <br />0.94 <br />Return Time: <br />0.94 <br />minutes <br />Total Scraper team cycle time: <br />3.67 <br />minutes <br />Adjusted for job conditions: <br />714.18 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />714.18 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />714.18 <br />LCY/Hour <br />Unadjusted unit production/hour: 860.46 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: <br />Unit cost: $1.298 /LCY <br />57.61 Hours <br />Total job cost: $53,401.91 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.