Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Haul 4630 Cu. Yd. to facilities area <br />Site: Keenesburg Strip Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: 033 State: Colorado <br />Date: 8/17/2011 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 637G <br />- Dozer: F NA <br />Pagel of 2 <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28 -033 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: <br />Cat D9R - 9SU (2005) <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cart Rreakdnwn_ Scraner Work Team Sunnort Eouinment Maintenance Equipment <br />Total work team'cost/hour: $782.79 <br />MATERIAL OUANTITIES <br />Initial volume: 4,630 CCY Swell factor: 1.060 <br />Loose volume: 4,908 LCY <br />Source of estimated volume: Permit commitment; 6 inches topsoil <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />25 <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$91.74 <br />NA <br />$49.19 <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$202.41 <br />NA <br />$29.47 <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$38.67 <br />NA <br />$38.49 <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$332.82 <br />NA <br />$117.15 <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />1 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$665.64 <br />Support: <br />$117.15 <br />Maint: <br />$0.00 <br />Total work team'cost/hour: $782.79 <br />MATERIAL OUANTITIES <br />Initial volume: 4,630 CCY Swell factor: 1.060 <br />Loose volume: 4,908 LCY <br />Source of estimated volume: Permit commitment; 6 inches topsoil <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,8501bs/LCY <br />Material description: <br />Sand - Damp <br />Rated Payload: <br />75,000 pounds <br />Payload Capacity: <br />26.32 LCY <br />Scraner Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />26.32 <br />LCY <br />CIRCES Cost Estimating Software <br />