Laserfiche WebLink
Pagel of 2 <br />BULLDOZER WORK <br />Task description: Push topsoil to powder magazine <br />Site: Keenesburg Strip Mine Permit Action: RN6 Permit/Job #: C1981028 <br />PROJECT IDENTIFICATION <br />Task #: 018 State: Colorado <br />Date: 8/19/2011 County: Weld <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Cat D9R - 9SU (2005) <br />405 <br />Semi - Universal <br />NA <br />1 ver day <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$49.19 NA <br />$1 17.89 100 <br />$0.00 0 <br />$38.49 NA <br />$205.56 <br />$205.56 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />370 <br />Swell factor: <br />1.060 <br />Loose volume: <br />392 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />60 feet <br />1.872.0 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />4,000 feet <br />2,8501bs /LCY <br />Weight description: Sand - Dam <br />Abbreviation: None <br />Filename: CO28 -018 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />CAT HB) <br />Dozing method: 1.000 <br />GEN.) <br />CIRCES Cost Estimating Software <br />