My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-17_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2011-10-17_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:05 PM
Creation date
11/2/2011 2:10:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/17/2011
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR 125
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY <br />Task description: Minor Revision 125 Cost Summary <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 125 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 300 State: Colorado <br />Date: 04- Oct -11 County: Delta <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -300 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />301 <br />Demolish and Remove Filter Building <br />DEMOLISH <br />1 <br />40.00 <br />$2,698.08 <br />SUBTOTALS: <br />40 <br />$2,698.08 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />10.00 <br />Profit: <br />10.00 <br />Total = <br />Total = <br />Total = <br />Total <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) _ <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 <br />Reclamation management and/or administration: 3.25 <br />CONTINGENCY: 0.00 <br />$54.50 <br />$28.33 <br />$585.60 <br />$269.81 <br />$938.24 <br />$3,636.32 <br />Total = 0.00 <br />Total = $154.54 <br />$118.18 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,210.96 <br />TOTAL BOND AMOUNT (direct + indirect) = $3,909.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.