Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />AVG.) <br />0.900 <br />(CAT HB <br />1.000 <br />GEN.) <br />1.000 <br />(AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3209 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />338.74 LCY /hr <br />338.74 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.586/LCY <br />Total job time: 45.74 Hours <br />Total job cost: $9,082.80 <br />C[RCES Cost Estimating Software <br />