Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />COST SUMMARY WORK <br />Cost Summary - Minor Revision 123 <br />Permit Action: Minor Revision 123 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 270 State: Colorado <br />Date: 05- May -11 County: Delta <br />User: JRS <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: None <br />Filename: C083 -270 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />271 <br />272 <br />273 <br />274 <br />275 <br />276 <br />277 <br />Plug and Seal Six Gob Vent Boreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />72.00 <br />$32,848.04 <br />$9,082.80 <br />$9,371.49 <br />$3,710.24 <br />$3,024.49 <br />$10,127.63 <br />$6,892.67 <br />Regrade Six Drill Pads <br />DOZER <br />45.74 <br />Regrade Light -Use Roads <br />DOZER <br />47.20 <br />Replace Topsoil from Stockpile to Six Drill Pads <br />DOZER <br />18.68 <br />Replace Topsoil from Stockpile to Light -Use <br />Roads <br />DOZER <br />15.23 <br />Reseed Six Drill Pads <br />REVEGE <br />11.02 <br />Reseed Light -Use Roads <br />REVEGE <br />7.50 <br />SUBTOTALS: <br />217.37 <br />$ $75,057.36 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02 <br />Total= <br />$1,516.16 <br />1.05 <br />Total = <br />$788.10 <br />108.68 <br />Total = <br />$6,364.30 <br />10.00 <br />Total = <br />$7,505.74 <br />TOTAL O & P = <br />$16,174.30 <br />CONTRACT AMOUNT (direct + O & P) = <br />$91,231.66 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.25 <br />Reclamation management and/or administration: 3.25 <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $3,877.35 <br />$2.965.03 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $23,016.67 <br />TOTAL, BOND AMOUNT (direct + indirect) = `698,074.03 <br />