My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-02_REVISION - M1986002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986002
>
2011-11-02_REVISION - M1986002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:24 PM
Creation date
11/2/2011 1:36:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986002
IBM Index Class Name
REVISION
Doc Date
11/2/2011
Doc Name
CN-01 response
From
Greg Lewicki and Associates, PLLC
To
DRMS
Type & Sequence
CN1
Email Name
THM
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Activity Description <br />Time (Months) <br />Cost ($) <br />Remove scale, and mobile equipment. <br />0.20 <br />$6,000 <br />Regrade near vertical side slopes to 3H:1V 4,000 cy <br />@ $0.87 cy <br />0.20 <br />$3,480 <br />Finish placement and grading of overburden and <br />wash fines. 35,000 C.Y. @ $1.25 <br />0.20 <br />$43,750 <br />Bring topsoil from stockpile, Place topsoil on 30 <br />acres (36,000 C.Y) at 6 -12" depth, spread and final <br />grade ($1.25 cy. <br />0.30 <br />$45,000 <br />Disc topsoil areas prior to seeding @ $200 /acre x 30 <br />acres <br />0.10 <br />$6,000 <br />Seed and mulch and drill seeding and crimp mulching <br />will be employed @ $1100 /acre x 30 acres. <br />0.25 <br />$33,000 <br />Totals <br />1.25 <br />$137,230 <br />DRMS Costs (21% x direct costs) <br />$28,818 <br />Total Bond Amount <br />$166,048 <br />Worst case reclamation costs for this scenario are shown in Table L <br />Table L -1 Reclamation Task and Cost Estimate <br />Craig Ranch Pit, March 2011 L - <br />
The URL can be used to link to this page
Your browser does not support the video tag.