My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-24_PERMIT FILE - C1983059
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-10-24_PERMIT FILE - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:17 PM
Creation date
11/2/2011 1:06:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
10/24/2011
Section_Exhibit Name
Exhibit 02 Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page 7 <br />Permit No. COG-850000 <br />H. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENT:' / <br />2. St:ormwater Management Plan (continued) <br />In the areas of coal mining facilities directly regulated by effluent <br />l:.mitations, it is expected that, through actions directed at <br />a~;hieving compliance with these limitations, the permittee will <br />effectively control most site stormwater discharges. Howeve.r,,in <br />other areas, this may not be the case. Some of the discharges are <br />oytside the coverage of the diversion ditches and sedimentation ponds <br />required under the facility's Colorado Mined Land Reclamation Division <br />(CMLRD) permit. Examples of such areas are roads and railroad Lines <br />used for transportation to and Erom the site, outslopes of ponds, <br />inactive loadouts, sites used for storage and maintenance of material <br />handling equipment and areas granted small area exemptions. <br />7'he plan shall describe all areas chat have not been previously <br />L~ermitted, but meet the definition of a stormwater discharge in 40.CFR <br />].22.26, and shall include a map (or maps) denoting the affected <br />:treas. The map(s) shall show the location of the discharge(s) or <br />drainage areas and indicate Che receiving waters. The map(s) shall <br />:label each stormwater outfall with a three digit number beginning with <br />.he next number after the last numher assigned to surface runoff <br />~~utfalls. <br />1'he plan shall describe the controls and/ar procedures that , <br />specifically address the goal of minimizing or eliminating the <br />pollution from these scurces. In some cases, this may entail <br />construction of physical facilities. In other cases, it may entail <br />developing new methods of operation or material handling and/or <br />replacement of materials with those that are less polluting. The <br />permittee shall make the appropriate determinations and receive the <br />appropriate approvals from the CMLRD. <br />Where necessary, Che plan shall include a schedule of activities <br />and/or construction with a reasonable timetable for implerr.entation of <br />any new operations or construction of new facilities necessary to <br />achieve the required goals. The timetable shall allow for attainment <br />of operational Level as expediently as possible, but in no case after <br />June 30. 1995, in conformance with Part 402(p)(4)(A) of the Federal <br />Clean Water Act. The Division will ensure that no proposEed timetable <br />is excessively lengthy. <br />Specific Requirements: <br />a) A coov of the elan shall be kept on-site and shall be readily <br />available co all personnel involved with compliance with the plan. <br />b) The plan shall contain a statement of certification, signed by top <br />management, supporting compliance with the stated goals. <br />c) ecords'pertaining to implementation of the plan shall be kept in '/_ <br />a log and made available on request to Division, CMIF.D and EPA <br />representatives (see Part I.C.4,). <br />
The URL can be used to link to this page
Your browser does not support the video tag.