My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-24_PERMIT FILE - C1983059
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-10-24_PERMIT FILE - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:17 PM
Creation date
11/2/2011 1:06:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
10/24/2011
Section_Exhibit Name
Exhibit 02 Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Page No. I8~ <br />Permit No. COG-850000 <br />B. RESPONSIBILITIES <br />5. Modification. Suspension Revocation, or Termination of Permits B1r the Division (continued) <br />iv. The Division determines that good cause exists to modify a permit condition because of events over which the pemrittee has no <br />control and for which there is no reasonable available remedy. <br />v. The permittee has received a variance. <br />vi. When required to incorporate applicable toxic effluent limitation or standards adopted pursuant to' 307(a) of the Federal act. <br />vii. When required by the reopener conditions in the permit. <br />viii. As necessary under 40 C.F.R. 403.8(e), to include a compliance schedule for the development of a pretreatment program. <br />ix. When the level of dischazge of any pollutant, which is not limited in the permit, exceeds the level, which can be achieved by the <br />technology-based treatment requirements appropriate to the permittee under Section 61.8(2) ofthe Colorado Discharge Permit <br />System Regulations. <br />x. To establish a pollutant notification level requued in Section 61.8(5) of the Colorado Dischazge Permit System.Regulations. <br />xi. To correct technical mistakes, such as errors in calculation, or mistaken interpretations of law made in determining permit <br />conditions, to the extent allowed in Section 61.10 of the Colorado Discharge Pemrit System Regulations. <br />xii. When required by a pemtit condition to incorporate a land application plan for beneficial reuse of sewage sludge, to revise an <br />existing land application plan, or to add a land application plan. <br />xiii. For any other cause provided in Section 61.10 of the Colorado Discharge Permit System Regulations. <br />c. At the request of a permittee, the Division may modify or terminate a permit and issue a new permit if the following conditions aze <br />met: <br />i. The Regional Administrator has been notified of the proposed modification or temilnation and does not object in writing within <br />thirty (30) days of receipt of notification, <br />ii. The Division fords that the permittee has shown reasonable grounds consistent with the Federal and State statutes and <br />regulations for such modifications or termination; <br />iii. Requirements of Section 61.15 of the Colorado Discharge Permit System Regulations have been met, and <br />iv. Requirements of public notice have been met. <br />d. Pemrit modification (except for minor modifications), termination or revocation and reissuance actions shall be subject to the <br />requirements of Sections 61.5(2), 61.5(3), 61.6, 6 L7 and 61.15 ofthe Colorado Dischazge Permit System Regulations. The Division <br />shall act on a pemrit modification request, other than minor modifications requests, within 180 days of receipt thereof. Except for <br />minor modifications, the terms of the existing permit govern and aze enforceable until the newly issued permit is formally modified <br />or revoked and reissued following public notice. <br />e. Upon consent by the permittee, the Division may make minor pemilt modifications without following the requirements of Sections <br />61.5(2), 61.5(3), 61.7, and 61.15 ofthe Colorado Discharge Permit System Regulations. Minor modifications to perrrtits aze limited <br />to: <br />i. Correcting typographical errors; or <br />ii. Increasing the frequency of monitoring or reporting by the permittee; or <br />iii. Changing an interim date in a schedule of compliance, provided the new date of compliance is not more than 120 days after the <br />date specific in the existing permit and does not interfere with attainment of the final compliance date requirement; or <br />iv. Allowing for a transfer in ownership or operational control of a facility where the Division determines that no other change in <br />the permit is necessary, provided that a written agreement containing a specific date for transfer of permit responsibility, <br />coverage and liability between the current and new permittees has been submitted to the Division; or <br />v. Changing the construction schedule for a discharger which is a new source, but no such change shall affect a dischazger's <br />obligation to have all pollution control equipment installed and in operation prior to dischazge; or <br />vi. Deleting a point source outfall when the discharge from that outfall is tem'tinated and does not result in discharge of pollutants <br />from other outfalis except in accordance with permit limits. <br />f. When a permit is modified, only the conditions subject to modification are reopened. If a permit is revoked and reissued, the entire <br />permit is reopened and subject [o revision and the permit is reissued for a new term. <br />
The URL can be used to link to this page
Your browser does not support the video tag.