My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-10-24_PERMIT FILE - C1983059
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-10-24_PERMIT FILE - C1983059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:17 PM
Creation date
11/2/2011 1:06:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
10/24/2011
Section_Exhibit Name
Exhibit 02 Other Permits
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 <br />Page No. b <br />Permil No. COG-650000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stotmwater Management Plan f SWMP) <br />A Stormwater Management Plan (SWMP) shall be developed for the portion of each facility covered by this section of the permit. The <br />SWMP shall be prepazed in accordance with good engineering practices. (A registered engineer need not complete the plan.) <br />The plan shall identify potential sources of pollution (including sediment), which may reasonably be expected to affect the quality of <br />stormwater discharges associated with the mining operation. In addition, the plan shall describe and ensure the implementation of best <br />management practices (BMPs), which will be used to reduce the pollutants in stormwater discharges, associated with mining activity. <br />Mining operations must implement the provisions of the SWMP required under this part as a condition of this permit. The Division <br />reserves the right to request and review the plans, and to require additional measures to prevent and control pollution, as needed. <br />The SWMP shall describe all areas that have not been previously permitted, and which meet the de£mition of a stormwater discharge in <br />40 CFR 122.26. Examples of such azeas aze roads and railroad lines used for transportation to and from the site, outslopes of ponds, <br />inactive loadouts, sites used for storage and maintenance of material handling equipment, and areas granted small azea exemptions. <br />a) SWMP Contents <br />The SWMP shall include the following items, at a minimum: <br />1) Site Map <br />The plan shall provide a site map or maps, which indicate, at a minimum: <br />- Mining site boundaries <br />- Access and haul roads <br />- Stormwater ouffalls and an outline of the drainage azea of each stormwater ouffall <br />- An estimate of [he direction of flow <br />- Materials handling azeas <br />- Each existing stmctural control measure to reduce pollutants in stormwater runoff <br />- Areas used for storage or disposal of overburden, materials, soils or wastes, including tailings piles or ponds <br />- Areas used for mineral milling and processing <br />- Springs, streams, wetlands and other surface waters <br />- Location of mine drainage or any other process water discharge points <br />- boundary of azea that contributes runoff to ouffalls that aze subject to effluent limitations guidelines. <br />- Date the map was prepazed <br />2) Description of Potential Pollutant Sources/Material Inventory <br />The plan shall provide a description of all potential sources (activities and materials), which may reasonably be expecud to add <br />pollutants to stormwater discharges. Such sources may include haul roads, equipment storage and maintenance azeas, fuel <br />storage azeas, etc. <br />In each case where stotmwater pollution potential exists, appropriate preventive measures must be taken and documented. <br />3) Stormwater Quality Controls <br />Each mining site covered by this permit shall develop a description of stormwater quality controls appropriate for that site, and <br />implement such controls. The appropriateness and priorities of controls in the plan shall reflect identified potential sources of <br />pollutants at the site. The description of stormwater quality controls shall address [he following minimum components, <br />including a schedule for implementing such controls: <br />a. SWMP Administrator - The S WMP shall identify a specific individual or individuals within the Honing organization who is <br />responsible for developing the SWMP and assisting the mine operator in its implementation, maintenance, and revision. <br />b. Materials Handline and Snill Prevention -Where materials can impact stormwater runotl; BMPs that reduce the potential <br />for contamination shall be described. For example, materials should be stored and handled in covered areas whenever <br />possible to prevent contact with stormwater; fuels and other chemicals should be stored within berms or secondary <br />containment devices to prevent leaks and spills from entering stormwater runoff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.