Laserfiche WebLink
• <br />• <br />TABLE 49A <br />Soil Stockpile Summary <br />STOCKPILE ID <br />CURRENT VOLUME <br />(CY) <br />VOLUME TO BE ADDED <br />(CY) <br />TOTAL VOLUME <br />(CY) <br />FCB -1 <br />7,400 <br />0 <br />7,400 <br />FCB -2 <br />350 <br />0 <br />350 <br />FCB -3 <br />150 <br />0 <br />150 <br />FCVF -1 <br />350 <br />0 <br />350 <br />SSS -1 <br />2,000 <br />0 <br />2,000 <br />RDT -1 <br />800 <br />0 <br />800 <br />WWTF -1 <br />4,000 <br />0 <br />4,000 <br />SF -I <br />54,850 <br />0 <br />54,850 <br />SF -2 <br />55,850 <br />0 <br />55,850 <br />SF -3 <br />109,400 <br />300 <br />109,700 <br />SF -4 <br />3,650 <br />0 <br />3,650 <br />SF -5 <br />700 <br />1,450 <br />2,150 <br />SF -6 <br />152,750 <br />450 <br />153,200 <br />SF -7 <br />38,700 <br />0 <br />38,700 <br />SF -8 <br />4,100 <br />0 <br />4,100 <br />SF -9 <br />5,800 <br />0 <br />5,800 <br />SF -10 <br />350 <br />0 <br />350 <br />SF -11 <br />100. <br />0 <br />100 <br />SPSP -1 <br />6,300 <br />100 <br />6,400 <br />SPSP -2 <br />4,150 <br />0 <br />4,150 <br />SF- 12,13,14 <br />20,000 <br />0 <br />20,000 <br />SF -15 <br />0 <br />800 <br />800 <br />SF 16 <br />0 <br />2,200 <br />2,200 <br />SF -17 <br />0 <br />900 <br />900 <br />CRDA -S1 and S2 <br />131,800 <br />1851400( ) <br />317,200 <br />TOTAL <br />603,550 <br />191,600 <br />795,150 <br />EASTERN MINING <br />DISTRICT <br />TORT Dewatering Borehole <br />7,200 <br />250 <br />7,450 <br />TORT Dewatering Treatment <br />Pond (includes access road) <br />0 <br />6,300 <br />6,300 <br />EMD Ventilation Site <br />4,750 <br />0 <br />4,750 <br />7 North Escape Shaft <br />2,200 <br />0 <br />2,200 <br />MC Shop to FC Tipple 1 <br />12,800 <br />12,800 <br />TOTAL <br />26,950 <br />6,550 <br />33,500 <br />NORTHERN MINING <br />DISTRICT <br />NMD Power Borehole & <br />Road <br />0 <br />5,700 <br />5,700 <br />Ventilation Shaft & Road <br />0 <br />2,550 <br />2,550 <br />18RT Shaft & Road" <br />0 <br />6,600 <br />6,600 <br />6MN Shaft, Road, & <br />Reservoiro4� <br />0 <br />23,700 <br />23,700 <br />19RT Borehole/Pipeline <br />0 <br />6,050 <br />6,050 <br />TOTAL <br />0 <br />44,600 <br />44,600 <br />WESTERN MINING DISTRICT <br />18Lft Shaft & Road <br />0 <br />13,550 <br />13,550 <br />WMD Stab. Borehole <br />0 <br />2,600 <br />2,600 <br />17LT Rockdust Install. <br />0 <br />4,000 <br />4,000 <br />15LT Vent Shaft <br />0 <br />5,600 <br />5,600 <br />16LT Utility Borehole <br />0 <br />10,900 <br />10,900 <br />TOTAL <br />0 <br />36,650 <br />1 36,650 <br />(1) Soil from Stockpiles SF -12 and 13 has been relocated to Stockpiles CRDA - S1 and S2 <br />(2) For CRDA S i and S2, the volume to be added will be direct handled or placed in a future stockpile(s) <br />(3) The volume listed for the 18RT Shaft/Roads is split among four stockpiles, roughly 40/30/15/15 percent beginning at <br />. the shaft pad and running back along the access road to the stock -pond location. Locations are shown on Map 29. <br />(4) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, roughly 40/30/15/15 <br />percent, beginning at the shaft pad stockpile and running back along the access road to the NW Mains Vent Shaft. <br />Locations are shown on Map 29. <br />