<br />TABLE 49A
<br />Soil Stockpile Summary
<br />STOCKPILE ID
<br />CURRENT VOLUME
<br />(CY)
<br />VOLUME TO BE ADDED
<br />(CY)
<br />TOTAL VOLUME
<br />(CY)
<br />FCB -1
<br />7,400
<br />0
<br />7,400
<br />FCB -2
<br />350
<br />0
<br />350
<br />FCB -3
<br />150
<br />0
<br />150
<br />FCVF -1
<br />350
<br />0
<br />350
<br />SSS -1
<br />2,000
<br />0
<br />2,000
<br />RDT -1
<br />800
<br />0
<br />800
<br />WWTF -1
<br />4,000
<br />0
<br />4,000
<br />SF -I
<br />54,850
<br />0
<br />54,850
<br />SF -2
<br />55,850
<br />0
<br />55,850
<br />SF -3
<br />109,400
<br />300
<br />109,700
<br />SF -4
<br />3,650
<br />0
<br />3,650
<br />SF -5
<br />700
<br />1,450
<br />2,150
<br />SF -6
<br />152,750
<br />450
<br />153,200
<br />SF -7
<br />38,700
<br />0
<br />38,700
<br />SF -8
<br />4,100
<br />0
<br />4,100
<br />SF -9
<br />5,800
<br />0
<br />5,800
<br />SF -10
<br />350
<br />0
<br />350
<br />SF -11
<br />100.
<br />0
<br />100
<br />SPSP -1
<br />6,300
<br />100
<br />6,400
<br />SPSP -2
<br />4,150
<br />0
<br />4,150
<br />SF- 12,13,14
<br />20,000
<br />0
<br />20,000
<br />SF -15
<br />0
<br />800
<br />800
<br />SF 16
<br />0
<br />2,200
<br />2,200
<br />SF -17
<br />0
<br />900
<br />900
<br />CRDA -S1 and S2
<br />131,800
<br />1851400( )
<br />317,200
<br />TOTAL
<br />603,550
<br />191,600
<br />795,150
<br />EASTERN MINING
<br />DISTRICT
<br />TORT Dewatering Borehole
<br />7,200
<br />250
<br />7,450
<br />TORT Dewatering Treatment
<br />Pond (includes access road)
<br />0
<br />6,300
<br />6,300
<br />EMD Ventilation Site
<br />4,750
<br />0
<br />4,750
<br />7 North Escape Shaft
<br />2,200
<br />0
<br />2,200
<br />MC Shop to FC Tipple 1
<br />12,800
<br />12,800
<br />TOTAL
<br />26,950
<br />6,550
<br />33,500
<br />NORTHERN MINING
<br />DISTRICT
<br />NMD Power Borehole &
<br />Road
<br />0
<br />5,700
<br />5,700
<br />Ventilation Shaft & Road
<br />0
<br />2,550
<br />2,550
<br />18RT Shaft & Road"
<br />0
<br />6,600
<br />6,600
<br />6MN Shaft, Road, &
<br />Reservoiro4�
<br />0
<br />23,700
<br />23,700
<br />19RT Borehole/Pipeline
<br />0
<br />6,050
<br />6,050
<br />TOTAL
<br />0
<br />44,600
<br />44,600
<br />WESTERN MINING DISTRICT
<br />18Lft Shaft & Road
<br />0
<br />13,550
<br />13,550
<br />WMD Stab. Borehole
<br />0
<br />2,600
<br />2,600
<br />17LT Rockdust Install.
<br />0
<br />4,000
<br />4,000
<br />15LT Vent Shaft
<br />0
<br />5,600
<br />5,600
<br />16LT Utility Borehole
<br />0
<br />10,900
<br />10,900
<br />TOTAL
<br />0
<br />36,650
<br />1 36,650
<br />(1) Soil from Stockpiles SF -12 and 13 has been relocated to Stockpiles CRDA - S1 and S2
<br />(2) For CRDA S i and S2, the volume to be added will be direct handled or placed in a future stockpile(s)
<br />(3) The volume listed for the 18RT Shaft/Roads is split among four stockpiles, roughly 40/30/15/15 percent beginning at
<br />. the shaft pad and running back along the access road to the stock -pond location. Locations are shown on Map 29.
<br />(4) The volume listed for the 6MN Shaft, Roads, and Reservoir is split among four stockpiles, roughly 40/30/15/15
<br />percent, beginning at the shaft pad stockpile and running back along the access road to the NW Mains Vent Shaft.
<br />Locations are shown on Map 29.