Laserfiche WebLink
uUIIUVGG1 VY VI"IlccL <.vuL u 1M& }f vvi 1 a6%' G vi L <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />AVG. <br />1.000 <br />(CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5053 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />353.71 LCY /hr <br />353.71 LCY /hr <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.561 /LCY <br />Total job time: <br />4.77 Hours <br />Total job cost: <br />$947.34 <br />CIRCES Cost Estimating Software <br />