My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-29_PERMIT FILE - C1983059 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1983059
>
2011-08-29_PERMIT FILE - C1983059 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:44 PM
Creation date
11/2/2011 9:51:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Permit File
Doc Date
8/29/2011
Doc Name
Bond Calculations Exhibit 10
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uUIIUVGG1 VY VI"IlccL <.vuL u 1M& }f vvi 1 a6%' G vi L <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Source <br />0.750 <br />AVG. <br />1.000 <br />(CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5053 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />353.71 LCY /hr <br />353.71 LCY /hr <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.561 /LCY <br />Total job time: <br />4.77 Hours <br />Total job cost: <br />$947.34 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.