Laserfiche WebLink
Pagel of 2 <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize/Demobilize Equipment for Yearly Site Maintenance <br />Site: Terror Creek Loadout Permit Action: 2011 Midterm Review Permit/Job #: C1983059 <br />PROJECT IDENTIFICATION <br />Task #: 019 State: Colorado Abbreviation: None <br />Date: 02- May -11 County: Delta Filename: C059 -019 <br />User: JRS <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EOUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />- Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />(TONS) <br />fleet <br />Cat D3G LGP - 3P <br />9.69 <br />$10.17 <br />$88.67 <br />10 <br />$988.35 <br />$886.70 <br />$0.00 <br />ROADABLE EOUIPMENT: None Mobilized <br />Subtotals: 1 $988.35 1 $886.70 1 $0.00 <br />CIRCES Cost Estimating Software <br />