My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-20_PERMIT FILE - C1982056A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2011-06-20_PERMIT FILE - C1982056A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:39 PM
Creation date
11/1/2011 3:05:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
6/20/2011
Doc Name
Pages 2.05-65 to 2.05-122.1
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
abandoned mine workings in the SWMD. The 6RT Thickener Underflow Borehole installation will be located <br />southeast of the intersection of Routt County Roads 27 (RCR27) and 33 (RCR33), on the north side of Foidel Creek <br />and the Twentymile Mine railroad spur. The Thickener Underflow Borehole will extend approximately 540 from <br />the-surface-into- <br />he surface into the sealed EMD mine workings. An existing light -use road extends approximately 250 feet from <br />RCR33 to this location. At both locations, a drill -pad and required drainage structures will be constructed. Buried <br />thickener underflow pipelines will be installed between the existing washplant facilities and the two thickener <br />underflow boreholes. The locations of both the thickener underflow boreholes and the associated pipelines are shown <br />on the Surface Facilities and Freshwater Systems Map, Map 24 (1/4). <br />Installation of the thickener underflow boreholes will involve placement of construction erosion controls (silt fence <br />and/or straw wattles), removal and windrowing of available soil materials from pad areas and the road margins <br />(6RT Borehole only), grading to establish level drill -pads and improve the existing light -use road (6Rt Borehole <br />only), placement of gravel as surfacing for the light -use road, excavation of temporary cuttings pits on the drill - <br />pads, drilling and casing of the boreholes, and installation of protective access manholes. On completion of drilling <br />and casing operations, the cuttings pits will be allowed to dry -out, material excavated from the pits will be replaced <br />and graded, and the pad surface will be graveled to control erosion and sediment and provide an all- weather <br />operating surface. The completed thickener underflow borehole installations will include the light -use road (6RT <br />only), a soil material stockpile (pad and road); the drill -pad (1MN — 25 x 180 feet, 6RT- 70 x 70 feet); the 6 -inch <br />cased boreholes, 14 -inch cemented surface casings, and a covered 8 -foot diameter CMP culvert manholes with <br />lightening protection. <br />Pipeline installation will involve removal and windrowing of soil materials from the pipeline construction corridor <br />(maximum - 40 -foot wide); trenching in most areas; placement of suitable bedding materials; placement, <br />connection, and pressure testing of the pipelines; backfilling and compaction of suitable fill materials around and <br />over the pipelines; backfilling and compaction of the trench; regrading; replacement of soil materials; and <br />•revegetation of all disturbed areas. Where the pipelines pass under RCR27, the Twentymile Mine railroad spur, <br />and Foidel Creek, the pipeline trench will be expanded to provide room for horizontal boring equipment, and the <br />pipelines will either be trenched or bored under these features. Because pipeline placement will necessarily involve <br />activities within the Foidel Creek buffer zone, TCC is requesting a temporary variance from the regulatory <br />requirements for operations within a buffer zone. The pipelines will be a double HDPE pipe system in critical <br />areas, with a 6 to 8 -inch carrier pipe inside a larger (maximum size - 10 -inch diameter) containment pipe, buried <br />approximately 5 -feet deep. The 1MN pipeline will extend approximately 1,800 feet, with the 6RT pipeline <br />extending approximately 8,000 feet. Electronic moisture sensors, along with pump controls, and shut -off valves will <br />provide for timely detection, shut -off, and isolation of the pipeline in the event of pipeline leakage. Access /inspection <br />manholes and pipe -tees for the moisture detection system will be located, at key points along the pipeline routes. <br />During construction, and for the minor surface structures that will remain during mining, drainage and sediment control <br />will be provided by Alternative Sediment Controls (ASC's) consisting of combined Best Management Practice (BMP) <br />measures. BMP's for the construction activities include: <br />• Minimizing the area of surface disturbance <br />• Scheduling of construction activities during the dry summer or early winter periods <br />• Placement of staked straw wattles downgradient of all surface disturbance areas to intercept any surface runoff <br />and trap associated suspended solids <br />• Installation of the Foidel Creek, RCR27, and railroad spur pipeline crossings as either trenched or bored/jacked <br />pipeline crossings under Foidel Creek, RCR27 and the railroad spur (if trenched, TC will obtain required <br />CDPHE -WQCD Temporary Construction Discharge Permit and will complete required USACE notification <br />• Soil replacement and stabilization with either the standard rangeland or riparian seed mixtures (as appropriate) <br />in a timely manner following completion of construction activities <br />• Construction - related surface disturbance will be limited to soil removal and windrowing from the pipeline trench <br />alignments and stockpiling for the borehole pad areas, excavation of the trenches and temporary stockpiling of <br />excavated material adjacent to the trenches, minor cut/fill grading to establish the borehole drill -pads and excavation of <br />MR10 -251 2.05 -84.6 05/27/10 <br />